Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Nov 2023 |
| Application filed | 10 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Renewable Envirogic Private Limited |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹4 crore |
| Village / locality | Nuagaon |
| Taluk / tehsil | Choudwar |
| District | Cuttack |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00516 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nuagaon, Choudwar, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Logistic Park of M/s Jagannath Industrial and Logistics Parks Private Limited… — environmental approval granted, 550 m away
- Proposed for Change in Product Mix and Capacity From Ppc, Psc and Opc to Psc,… — initial checks, 2.3 km away
- Transfer of Environmental Clearance for Phase-1 (0.386 MTPA as per valid CTO)… — environmental approval granted, 2.3 km away
- Transfer of Environmental Clearance vide Ref No: 608/SEIAA dated 04th March,… — not approved, 2.3 km away
- Revision and Expansion of Kingston Logistics Park at Mouza: Indranipatna, Plot… — environmental approval granted, 2.6 km away
- Kingston Logistics park at Mouza Indranipatna, plot no 114/1316 Mouza… — environmental approval granted, 2.8 km away
- Chhotapadagaon Morrum Quarry — lapsed, 5.3 km away
- New 6-lane Capital Region Ring Road (CRRR) from Gobindpur to Tangi — not approved, 5.8 km away
All 3 Renewable Envirogic projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.