Project details
| Official title | Proposed for Change in Product Mix and Capacity From Ppc, Psc and Opc to Psc, Ppc, Pcc, Opc and Ggbs by Changing the Raw Material Composition Without Changing the Total Production Capacity 0.386 Mtpa of M/S Toshali Cements Private Limited at Village-Lndranipatna, P.O. Chasapar, Choudwar, Dist- Cuttack Odisha |
|---|---|
| Status | Initial checks |
| Status since | 27 Feb 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Toshali Cements Private Limited |
| Use | Industrial |
| Land area | 33.5 acres (13.5 ha) |
| Plot area | 1,35,400 m² (14,57,432 sq ft) |
| Project cost | ₹56 crore |
| Village / locality | Indranipatna |
| Taluk / tehsil | Choudwar |
| District | Cuttack |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02986 |
In context
43 applications in Cuttack since January 2022 are in the same category (Buildings & townships): 25 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 33.5 acres, this one is larger than 88% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Indranipatna, Choudwar, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance for Phase-1 (0.386 MTPA as per valid CTO)… — environmental approval granted, 0 m away
- Transfer of Environmental Clearance vide Ref No: 608/SEIAA dated 04th March,… — not approved, 0 m away
- Kingston Logistics park at Mouza Indranipatna, plot no 114/1316 Mouza… — environmental approval granted, 750 m away
- Revision and Expansion of Kingston Logistics Park at Mouza: Indranipatna, Plot… — environmental approval granted, 850 m away
- Proposed Common Biomedical Waste Treatment Facility (CBWTF) At:IDCO Plot No.… — cleared for impact study, 2.3 km away
- Logistic Park of M/s Jagannath Industrial and Logistics Parks Private Limited… — environmental approval granted, 2.8 km away
- Proposed Redevelopment of Acharya Harihar Post Graduate Institute of Cancer… — lapsed, 5.4 km away
- Proposed Environmental Clearance for four blocks of Industrial Shed for… — environmental approval granted, 5.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.