WithdrawnIndustry · Ganjam, Odisha

Production of 2.214 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Morabai Out Still Liquor Shop

Production of 2.214 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Morabai Out Still Liquor Shop is a withdrawn industrial project in Antrigam, Hinjili, Ganjam, Odisha. The site covers 0 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 13 Mar 2025).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Production of 2.214 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Morabai Out Still Liquor Shop is a withdrawn industrial project in Antrigam, Hinjili, Ganjam, Odisha. The site covers 0 acres.

Who is building it?

The applicant is Hema Sahu.

Has it been approved?

No. The application was withdrawn on 13 Mar 2025, so it is no longer under consideration.

Where is it?

In Antrigam, Hinjili, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹20 lakh and a site of 0 acres.

When was it filed?

The application was filed on 29 Oct 2024.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Production of 2.214 KLD Mahua flower-based out still country liquor manufacturing unit,…

Project details

Official titleProduction of 2.214 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Morabai Out Still Liquor Shop, in village Morabai, Tahsil- Purushottampur, Dist.- Ganjam
StatusWithdrawn
Status since13 Mar 2025
Application filed29 Oct 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantHema Sahu
Land area100 m²
Project cost₹20 lakh
Village / localityAntrigam
Taluk / tehsilHinjili
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00738

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 4 May 2026Environmental approval granted0 acres₹20 lakh
Validity extension filed 23 May 2025Environmental approval granted0 acres₹20 lakh
Validity extension filed 13 Feb 2025Environmental approval granted0 acres₹20 lakh
Validity extension filed 29 Oct 2024 (this page)Withdrawn0 acres₹20 lakh

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 100% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Antrigam, Hinjili, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hema Sahu in Ganjam

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.