What is Developing? Open the mapMap

Environmental approval grantedIndustry · Ganjam, Odisha

Production of 0.948 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Nandika Out Still Liquor Shop

Production of 0.948 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Nandika Out Still Liquor Shop is an approved industrial project in Antrigam, Hinjili, Ganjam, Odisha. The site covers 0 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Aug 2025).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Production of 0.948 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Nandika Out Still Liquor Shop is an approved industrial project in Antrigam, Hinjili, Ganjam, Odisha. The site covers 0 acres.

Who is building it?

The applicant is Hema Sahu.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Aug 2025), as of 27 Nov 2026.

Where is it?

In Antrigam, Hinjili, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹20 lakh and a site of 0 acres.

When was it filed?

The application was filed on 24 May 2025.

Project details

Official titleProduction of 0.948 KLD Mahua flower-based out still country liquor manufacturing unit, M/s Nandika Out Still Liquor Shop, in village Morabai, Tahsil- Purushottampur, Dist.- Ganjam Single Window Number: SW/214529/2024 Proposal Number: SIA/OR/IND2/503518/2025 State: ODISHA
StatusEnvironmental approval granted
Status since5 Aug 2025
Application filed24 May 2025
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantHema Sahu
Land area100 m²
Project cost₹20 lakh
Village / localityAntrigam
Taluk / tehsilHinjili
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01954

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 4 May 2026Withdrawn0 acres₹20 lakh
Validity extension filed 24 May 2025 (this page)Environmental approval granted0 acres₹20 lakh
Validity extension filed 13 Feb 2025Environmental approval granted0 acres₹20 lakh

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 100% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Antrigam, Hinjili, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hema Sahu in Ganjam

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.