What is Developing? Open the mapMap

Cleared for impact studyIndustry · Jharsuguda, Odisha

Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Action Ispat and Power Pvt. Ltd

Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Action Ispat and Power Pvt. Ltd is a proposed industrial project in Marakuta, Jharsuguda, Odisha. The site covers 7,862.6 acres. Its stated project cost is ₹21,284 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jun 2024).

See it on the live map All projects in Jharsuguda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Action Ispat and Power Pvt. Ltd is a proposed industrial project in Marakuta, Jharsuguda, Odisha. The site covers 7,862.6 acres.

Who is building it?

The applicant is Action Ispat and Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Jun 2024), as of 27 Nov 2026.

Where is it?

In Marakuta, Jharsuguda, Odisha.

How big is it?

It has a stated cost of ₹21,284 crore and a site of 7,862.6 acres.

When was it filed?

The application was filed on 9 Jun 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s…

Project details

Official titleExpansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Action Ispat and Power Pvt. Ltd. at Village Beherapali, Budipadar, Ektali U No.1, Marakuta, Pandripathar, Singhabaga, Kukurjangha, Jamera, Hanshamurakatapali, Tehsil and District Jharsuguda, Odisha
StatusCleared for impact study
Status since13 Jun 2024
Application filed9 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAction Ispat and Power Private Limited
Land area7,862.6 acres (3,181.9 ha)
Project cost₹21,284 crore
Village / localityMarakuta
Taluk / tehsilJharsuguda
DistrictJharsuguda
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00753

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 22 Jan 2025Environmental approval granted7,862.6 acres₹21,284 crore
Early planning filed 9 Jun 2024 (this page)Cleared for impact study7,862.6 acres₹21,284 crore

In context

38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7,862.6 acres, this one is larger than 95% of them.

23 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Marakuta, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (14.5 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.