Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Action Ispat and Power Pvt. Ltd is a proposed industrial project in Marakuta, Jharsuguda, Odisha. The site covers 7,862.6 acres.
Who is building it?
The applicant is Action Ispat and Power Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Jun 2024), as of 27 Nov 2026.
Where is it?
In Marakuta, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹21,284 crore and a site of 7,862.6 acres.
When was it filed?
The application was filed on 9 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s…
Project details
| Official title | Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Action Ispat and Power Pvt. Ltd. at Village Beherapali, Budipadar, Ektali U No.1, Marakuta, Pandripathar, Singhabaga, Kukurjangha, Jamera, Hanshamurakatapali, Tehsil and District Jharsuguda, Odisha |
|---|---|
| Status | Cleared for impact study |
| Status since | 13 Jun 2024 |
| Application filed | 9 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Action Ispat and Power Private Limited |
| Land area | 7,862.6 acres (3,181.9 ha) |
| Project cost | ₹21,284 crore |
| Village / locality | Marakuta |
| Taluk / tehsil | Jharsuguda |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00753 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 22 Jan 2025 | Environmental approval granted | 7,862.6 acres | ₹21,284 crore |
| Early planning filed 9 Jun 2024 (this page) | Cleared for impact study | 7,862.6 acres | ₹21,284 crore |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7,862.6 acres, this one is larger than 95% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marakuta, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (14.5 km away).
Other projects nearby
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished… — environmental approval granted, 0 m away
- Change in configuration of Integrated Steel Plant from 2x0.6 MTPA… — initial checks, 1.1 km away
- Proposed for Change in configuration and production capacity from SMS of… — initial checks, 1.1 km away
- Transfer of Environment Clearance (EC) w.r.t Expansion of Integrated Steel… — environmental approval granted, 1.1 km away
- Environment Clearance for Integrated Steel Plant with Pelletization Plant (2 x… — cleared for impact study, 1.1 km away
- Environment Clearance for Integrated Steel Plant with Pelletization Plant (2 x… — environmental approval granted, 1.1 km away
- Lahandabud Sand Bed 'C' Sand Quarry over an area of 8.0937 Ha at Mouza… — environmental approval granted, 1.8 km away
- Lahandabud Sand Mining Cluster constitute of Lahandabud B and Lahandabud C… — cleared for impact study, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.