What is Developing? Open the mapMap

Initial checksBuildings & townships · Jharsuguda, Odisha

Proposed for Change in configuration and production capacity from SMS of 400000 TPA with IF of 2x8 T/H & 1x15 T/H, EAF(2x25T/H), LRF 80 (2x15+2x25) and Rolling Mill of 2,00,000 TPA, with 78 MW CPP (24 MW #WHRB and 54 MW #AFBC) To SMS of 2,97,000 TPA with IF of 6x15 T/H, LRF 80 (2x40) T and Rolling Mill of 2,50,000 TPA with 78 MW CPP (24 MW #WHRB, 04 MW#AFBC and 50 MW #CFBC) without changing other facilities granted in EC

Proposed for Change in configuration and production capacity from SMS of 400000 TPA with IF of 2x8 T/H & 1x15 T/H, EAF(2x25T/H), LRF 80 (2x15+2x25) and Rolling Mill of 2,00,000 TPA, with 78 MW CPP (24 MW #WHRB and 54 MW #AFBC) To SMS of 2,97,000 TPA with IF of 6x15 T/H, LRF 80 (2x40) T and Rolling Mill of 2,50,000 TPA with 78 MW CPP (24 MW #WHRB, 04 MW#AFBC and 50 MW #CFBC) without changing other facilities granted in EC is a proposed industrial building project in Jh>Rsuguda Town, Jharsuguda, Odisha. The site covers 178 acres. Its stated project cost is ₹571.3 crore. As of 27 Nov 2026, its status is “Initial checks” (since 22 Oct 2024).

See it on the live map All projects in Jharsuguda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed for Change in configuration and production capacity from SMS of 400000 TPA with IF of 2x8 T/H & 1x15 T/H, EAF(2x25T/H), LRF 80 (2x15+2x25) and Rolling Mill of 2,00,000 TPA, with 78 MW CPP (24 MW #WHRB and 54 MW #AFBC) To SMS of 2,97,000 TPA with IF of 6x15 T/H, LRF 80 (2x40) T and Rolling Mill of 2,50,000 TPA with 78 MW CPP (24 MW #WHRB, 04 MW#AFBC and 50 MW #CFBC) without changing other facilities granted in EC is a proposed industrial building project in Jh>Rsuguda Town, Jharsuguda, Odisha. The site covers 178 acres.

Who is building it?

The applicant is Thakur Prasad Sao and Sons Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Jh>Rsuguda Town, Jharsuguda, Odisha.

How big is it?

It has a stated cost of ₹571.3 crore and a site of 178 acres.

When was it filed?

The application was filed on 22 Oct 2024.

Project details

Official titleProposed for Change in configuration and production capacity from SMS of 400000 TPA with IF of 2x8 T/H & 1x15 T/H, EAF(2x25T/H), LRF 80 (2x15+2x25) and Rolling Mill of 2,00,000 TPA, with 78 MW CPP (24 MW #WHRB and 54 MW #AFBC) To SMS of 2,97,000 TPA with IF of 6x15 T/H, LRF 80 (2x40) T and Rolling Mill of 2,50,000 TPA with 78 MW CPP (24 MW #WHRB, 04 MW#AFBC and 50 MW #CFBC) without changing other facilities granted in EC. at Village-Lahandabud, PO.-H. Katapali, District-Jharsuguda, Odisha
StatusInitial checks
Status since22 Oct 2024
Application filed22 Oct 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantThakur Prasad Sao and Sons Private Limited
UseIndustrial
Height100 m
Land area178 acres (72 ha)
Project cost₹571.3 crore
Village / localityJh>Rsuguda Town
Taluk / tehsilJharsuguda
DistrictJharsuguda
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00988

In context

11 applications in Jharsuguda since January 2022 are in the same category (Buildings & townships): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 178 acres, this one is larger than 55% of them.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jh>Rsuguda Town, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (15 km away).

Other projects nearby

More from Thakur Prasad Sao and Sons Private Limited in Jharsuguda

All 5 Thakur Prasad Sao and Sons projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.