One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Greenfield Coal Tar Distillation Unit of Capacity 2,00,000 TPA and 1,00,000 TPA…
Project details
| Official title | Proposed Greenfield Coal Tar Distillation Unit of Capacity 2,00,000 TPA and 1,00,000 TPA Carbon black with 11 MW of Co-generation Power Plant located at Village- Jakhapura, Tehsil- Danagadi, District- Jajpur, Odisha by M/s. Sirius Speciality Chemicals Private Limited (Whole subsidiary of Sanvira Industries Limited) |
|---|---|
| Status | Cleared for impact study |
| Status since | 20 Jan 2025 |
| Application filed | 5 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sirius Speciality Chemicals Private Limited |
| Land area | 52.8 acres (21.4 ha) |
| Project cost | ₹600 crore |
| Village / locality | Jakhapura |
| Taluk / tehsil | Jakhapura |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00764 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Aug 2025 | Environmental approval granted | 52.8 acres | ₹600 crore |
| Early planning filed 5 Oct 2024 (this page) | Cleared for impact study | 52.8 acres | ₹600 crore |
In context
56 applications in Jajapur since January 2022 are in the same category (Industry): 27 approved, 15 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 52.8 acres, this one is smaller than 68% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jakhapura, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (4.4 km away).
Other projects nearby
- Proposed Greenfield Coal Tar Distillation Unit of Capacity 2,00,000 TPA and… — environmental approval granted, 0 m away
- Commissioning of Partially Established 1 x 16.5 MVA Submerged Arc Furnace for… — lapsed, 1.1 km away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — environmental approval granted, 1.1 km away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — withdrawn, 1.1 km away
- Greenfield project for Production of 750,000 TPA Rolled Products at… — cleared for impact study, 1.1 km away
- Transfer of Environmental Clearance (name change) from M/s JSL Ferrous Limited… — environmental approval granted, 1.1 km away
- Split of existing Environmental Clearances (dt. 12.06.2007,03.07.2008 amended… — environmental approval granted, 1.1 km away
- Split of existing Environmental Clearances (dt. 12.06.2007,03.07.2008 amended… — withdrawn, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.