Environmental approval grantedPower · Jharsuguda, Odisha

Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW"

Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" is an approved power project in Kumbh>Rbandha, Banaharapali, Jharsuguda, Odisha. The site covers 1,474 acres. Its stated project cost is ₹3,200 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 Dec 2024).

See it on the live map All projects in Jharsuguda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" is an approved power project in Kumbh>Rbandha, Banaharapali, Jharsuguda, Odisha. The site covers 1,474 acres.

Who is building it?

The applicant is Ind Barath Energy Utkal Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 7 Dec 2024), as of 27 Nov 2026.

Where is it?

In Kumbh>Rbandha, Banaharapali, Jharsuguda, Odisha.

How big is it?

It has a stated cost of ₹3,200 crore and a site of 1,474 acres.

When was it filed?

The application was filed on 12 May 2024.

Project details

Official titleExpansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" at Village- Sahajbahal, Tehsil: Lakhanpur, Dist: Jharsuguda, State: Odisha by M/s Ind-Barath Energy (Utkal) Ltd (IBEUL) (subsidiary of JSW Energy Ltd.)
StatusEnvironmental approval granted
Status since7 Dec 2024
Application filed12 May 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorPower
ApplicantInd Barath Energy Utkal Limited
Land area1,474 acres (596.5 ha)
Project cost₹3,200 crore
Village / localityKumbh>Rbandha
Taluk / tehsilBanaharapali
DistrictJharsuguda
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00877

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 12 May 2024 (this page)Environmental approval granted1,474 acres₹3,200 crore
Early planning filed 4 Oct 2023Cleared for impact study1,474 acres₹3,200 crore

In context

19 applications in Jharsuguda since January 2022 are in the same category (Power): 8 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,474 acres, this one is larger than 58% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kumbh>Rbandha, Banaharapali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (12.2 km away).

Other projects nearby

More from Ind Barath Energy Utkal Limited in Jharsuguda

All 11 Ind Barath Energy Utkal projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.