What is Developing? Open the mapMap

Environmental approval grantedPower · Jharsuguda, Odisha

Change in Name of the Company from M/s Ind Barath Energy (Utkal) Limited (Subsidiary of JSW Energy Ltd.) to JSW Energy (Utkal) Limited

Change in Name of the Company from M/s Ind Barath Energy (Utkal) Limited (Subsidiary of JSW Energy Ltd.) to JSW Energy (Utkal) Limited is an approved power project in Barap>Li, Banaharapali, Jharsuguda, Odisha. The site covers 593.1 acres. Its stated project cost is ₹1,491.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Apr 2025).

See it on the live map All projects in Jharsuguda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Change in Name of the Company from M/s Ind Barath Energy (Utkal) Limited (Subsidiary of JSW Energy Ltd.) to JSW Energy (Utkal) Limited is an approved power project in Barap>Li, Banaharapali, Jharsuguda, Odisha. The site covers 593.1 acres.

Who is building it?

The applicant is Ind Barath Energy Utkal Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 Apr 2025), as of 27 Nov 2026.

Where is it?

In Barap>Li, Banaharapali, Jharsuguda, Odisha.

How big is it?

It has a stated cost of ₹1,491.2 crore and a site of 593.1 acres.

When was it filed?

The application was filed on 2 Apr 2025.

Project details

StatusEnvironmental approval granted
Status since28 Apr 2025
Application filed2 Apr 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantInd Barath Energy Utkal Limited
Land area593.1 acres (240 ha)
Project cost₹1,491.2 crore
Village / localityBarap>Li
Taluk / tehsilBanaharapali
DistrictJharsuguda
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02640

In context

19 applications in Jharsuguda since January 2022 are in the same category (Power): 8 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 593.1 acres, this one is smaller than 58% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barap>Li, Banaharapali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (12.2 km away).

Other projects nearby

More from Ind Barath Energy Utkal Limited in Jharsuguda

All 11 Ind Barath Energy Utkal projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.