Quick answers
What is this project?
Change in Name of the Company from M/s Ind Barath Energy (Utkal) Limited (Subsidiary of JSW Energy Ltd.) to JSW Energy (Utkal) Limited is an approved power project in Barap>Li, Banaharapali, Jharsuguda, Odisha. The site covers 593.1 acres.
Who is building it?
The applicant is Ind Barath Energy Utkal Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Apr 2025), as of 27 Nov 2026.
Where is it?
In Barap>Li, Banaharapali, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹1,491.2 crore and a site of 593.1 acres.
When was it filed?
The application was filed on 2 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Apr 2025 |
| Application filed | 2 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Ind Barath Energy Utkal Limited |
| Land area | 593.1 acres (240 ha) |
| Project cost | ₹1,491.2 crore |
| Village / locality | Barap>Li |
| Taluk / tehsil | Banaharapali |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02640 |
In context
19 applications in Jharsuguda since January 2022 are in the same category (Power): 8 approved, 8 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 593.1 acres, this one is smaller than 58% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barap>Li, Banaharapali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (12.2 km away).
Other projects nearby
- Transfer of lease and change in the name from M/s Ind Barath Energy (Utkal)… — under forest review, 0 m away
- Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" — environmental approval granted, 50 m away
- Transfer of Ownership from M/s Ind- Barath Energy (Utkal) Limited to M/s JSW… — lapsed, 50 m away
- Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" — cleared for impact study, 50 m away
- Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" — returned to applicant, 50 m away
- Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" — returned to applicant, 250 m away
- JSW Steel Ltd. Coal Washery project (Ind Barath Energy (Utkal) Ltd.) — returned to applicant, 700 m away
- 400 KV D/C Transmission line connecting from 2x 350MW Thernal power plant to… — more information requested, 1.2 km away
More from Ind Barath Energy Utkal Limited in Jharsuguda
- Transfer of lease and change in the name from M/s Ind Barath Energy (Utkal)… — under forest review
- Bartap (Revised) Coal Mine — forest land use approved
- Bartap (Revised) Coal Mine — not approved
- Expansion of Coal Based Thermal Power Plant from 1x350 MW to 2X350 MW" — environmental approval granted
- Transfer of Ownership from M/s Ind- Barath Energy (Utkal) Limited to M/s JSW… — lapsed
- 400 KV D/C Transmission line connecting from 2x 350MW Thernal power plant to… — more information requested
All 11 Ind Barath Energy Utkal projects across India