Cleared for impact studyMining · Kendujhar, Odisha

Iron Ore beneficiation Plant over an area of 1.768 acre with throughput capacity 0.15 MTPA of M/s Dubey Brothers Iron & Metals Pvt. Ltd. in Mouza- Kolha Barapada, Village Barbil, Tahsil Barbil, Dist Keonjhar, Odisha.

Iron Ore beneficiation Plant over an area of 1.768 acre with throughput capacity 0.15 MTPA of M/s Dubey Brothers Iron & Metals Pvt. Ltd. in Mouza- Kolha Barapada, Village Barbil, Tahsil Barbil, Dist Keonjhar, Odisha is a proposed mining project in Kolhabarapada, Barbil, Kendujhar, Odisha. The site covers 1.8 acres. Its stated project cost is ₹9.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Sept 2024).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Iron Ore beneficiation Plant over an area of 1.768 acre with throughput capacity 0.15 MTPA of M/s Dubey Brothers Iron & Metals Pvt. Ltd. in Mouza- Kolha Barapada, Village Barbil, Tahsil Barbil, Dist Keonjhar, Odisha is a proposed mining project in Kolhabarapada, Barbil, Kendujhar, Odisha. The site covers 1.8 acres.

Who is building it?

The applicant is Dubey Brothers Iron & Metals Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Sept 2024), as of 27 Nov 2026.

Where is it?

In Kolhabarapada, Barbil, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹9.1 crore and a site of 1.8 acres.

When was it filed?

The application was filed on 12 Jul 2024.

Project details

StatusCleared for impact study
Status since17 Sept 2024
Application filed12 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDubey Brothers Iron & Metals Private Limited
Land area1.8 acres (0.7 ha)
Project cost₹9.1 crore
Village / localityKolhabarapada
Taluk / tehsilBarbil
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00883

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Sept 2025More information requested1.8 acres₹9.1 crore
Early planning filed 12 Jul 2024 (this page)Cleared for impact study1.8 acres₹9.1 crore

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is smaller than 97% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Kolhabarapada, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.