What is Developing? Open the mapMap

Returned to applicantMining · Kendujhar, Odisha

Amendment in Ec of Bolani Ores Mines (6.90 Sq Miles Ml) Allowing Liquidation of Old Iron Ore Dump Fines Produced From Adjoining 5.10 Sq Miles Ml and Stacked in 6.90 Sq. Miles Ml Through Dispatching for Selling in Open Market Or Captive Use Directly Or Supplying to Conversion Agents for Captive Use of Converted Pellets Without Any Change in Approved Configuration Keeping the Excavation and Dispatch of Dump Fines From Both Mining Leases Within 3 Mtpa As Per the Approved Ec of 5.10 Sq. Miles Ml

Amendment in Ec of Bolani Ores Mines (6.90 Sq Miles Ml) Allowing Liquidation of Old Iron Ore Dump Fines Produced From Adjoining 5.10 Sq Miles Ml and Stacked in 6.90 Sq. Miles Ml Through Dispatching for Selling in Open Market Or Captive Use Directly Or Supplying to Conversion Agents for Captive Use of Converted Pellets Without Any Change in Approved Configuration Keeping the Excavation and Dispatch of Dump Fines From Both Mining Leases Within 3 Mtpa As Per the Approved Ec of 5.10 Sq. Miles Ml is a proposed mining project in M>Dak>Mbeda, Barbil, Kendujhar, Odisha. The site covers 3,920 acres. Its stated project cost is ₹429.3 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 4 Dec 2024).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Amendment in Ec of Bolani Ores Mines (6.90 Sq Miles Ml) Allowing Liquidation of Old Iron Ore Dump Fines Produced From Adjoining 5.10 Sq Miles Ml and Stacked in 6.90 Sq. Miles Ml Through Dispatching for Selling in Open Market Or Captive Use Directly Or Supplying to Conversion Agents for Captive Use of Converted Pellets Without Any Change in Approved Configuration Keeping the Excavation and Dispatch of Dump Fines From Both Mining Leases Within 3 Mtpa As Per the Approved Ec of 5.10 Sq. Miles Ml is a proposed mining project in M>Dak>Mbeda, Barbil, Kendujhar, Odisha. The site covers 3,920 acres.

Who is building it?

The applicant is Steel Authority of India LTD.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In M>Dak>Mbeda, Barbil, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹429.3 crore and a site of 3,920 acres.

When was it filed?

The application was filed on 18 Mar 2024.

Project details

StatusReturned to applicant
Status since4 Dec 2024
Application filed18 Mar 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantSteel Authority of India LTD
Land area3,920 acres (1,586.4 ha)
Project cost₹429.3 crore
Village / localityM>Dak>Mbeda
Taluk / tehsilBarbil
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01111

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3,920 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

M>Dak>Mbeda, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Steel Authority of India LTD in Kendujhar

3 Steel Authority of India projects in Kendujhar
All 51 Steel Authority of India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.