Project details
| Official title | Expansion of Crude Steel Production of Integrated Steel Plant from 4.50 MTPA to 9.50 MTPA along with Additional 320 MW Captive Power Plant (Total CPP – 866 MW) and additional 3 MTPA Cement Plant (Total Cement Plant – 5 MTPA) at Village – Thelkoloi, Post – Lapanga, Block – Rengali, District - Sambalpur, State – Odisha – 768 212 by M/s. Bhushan Power & Steel Limited (Env. Consultant – Anacon Laboratories Pvt. Ltd.) |
|---|---|
| Status | Withdrawn |
| Status since | 30 Dec 2024 |
| Application filed | 30 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bhushan Power & Steel Limited |
| Land area | 2,763.4 acres (1,118.3 ha) |
| Project cost | ₹36,900 crore |
| Village / locality | Thelkolai |
| Taluk / tehsil | Thelkoloi |
| District | Sambalpur |
| State | Odisha |
| Location from | Site area on record |
| Our reference | WID-OR-00925 |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2,763.4 acres, this one is larger than 82% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thelkolai, Thelkoloi, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of Aluminium production capacity from 3.99 LTPA to 4.99 LTPA and… — initial checks, 1.5 km away
- Application for Split of Environmental Clearances (EC) issued to M/s. Bhushan… — more information requested, 1.6 km away
- Amendment in EC Conditions and Consolidation of all ECs issued to M/s. Bhushan… — more information requested, 1.6 km away
- Expansion of Crude Steel Production of Integrated Steel Plant From 4.50 MTPA… — cleared for impact study, 1.7 km away
- Expansion of Crude Steel Production of Integrated Steel Plant from 4.50 MTPA… — not approved, 1.7 km away
- Bhushan Power & Steel Limited - Corrigendum in EC vide Proposal No.… — environmental approval granted, 1.8 km away
- Expansion of Crude Steel Production of Integrated Steel Plant from 4.50 MTPA… — not approved, 2.1 km away
- Expansion of Sponge Iron Plant from 1,60,000 TPA to 2,60,000 TPA by… — lapsed, 2.8 km away
More from Bhushan Power & Steel Limited in Sambalpur
- Application for Split of Environmental Clearances (EC) issued to M/s. Bhushan… — more information requested
- Amendment in EC Conditions and Consolidation of all ECs issued to M/s. Bhushan… — more information requested
- Expansion of Crude Steel Production of Integrated Steel Plant From 4.50 MTPA… — cleared for impact study
- Expansion of Crude Steel Production of Integrated Steel Plant from 4.50 MTPA… — not approved
- Expansion of Crude Steel Production of Integrated Steel Plant from 4.50 MTPA… — not approved
- Bhushan Power & Steel Limited - Corrigendum in EC vide Proposal No.… — environmental approval granted
7 Bhushan Power & Steel projects in Sambalpur
All 8 Bhushan Power & Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.