Quick answers
What is this project?
Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera River Sand Bed Over an Area 12.02acres Or 4.864ha is a lapsed mining project in Deogan, Bargarh Sadar, Bargarh, Odisha. The site covers 12 acres.
Who is building it?
The applicant is Bishnu Rout.
Has it been approved?
No. The application was lapsed on 9 Feb 2025, so it is no longer under consideration.
Where is it?
In Deogan, Bargarh Sadar, Bargarh, Odisha.
How big is it?
It has a stated cost of ₹37 lakh and a site of 12 acres.
When was it filed?
The application was filed on 5 Jul 2024.
Project details
| Official title | Proposal for Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera River Sand Bed Over an Area 12.02acres Or 4.864ha in Sayan Village Under Bargarh Tahasil of Bargarh District Odisha |
|---|---|
| Status | Lapsed |
| Status since | 9 Feb 2025 |
| Application filed | 5 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Bishnu Rout |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹37 lakh |
| Village / locality | Deogan |
| Taluk / tehsil | Bargarh Sadar |
| District | Bargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01006 |
In context
57 applications in Bargarh since January 2022 are in the same category (Mining): 30 approved, 3 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 12 acres, this one is larger than 53% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Deogan, Bargarh Sadar, Bargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — lapsed, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — withdrawn, 0 m away
- Transfer of EC for Deogaon Zeera River Sand Bed over an area of 12.02 acres or… — lapsed, 1.3 km away
- Transfer of EC of TURUNGA ZEERA RIVER SAND BED over an area 12.20acres or… — lapsed, 2.3 km away
- Environmental Clearance for Production of Country Liquor From the… — initial checks, 3.8 km away
- Transfer of EC of Bageibira Zeera River Sand Bed over an area of 12.06 Acres… — environmental approval granted, 4.2 km away
- Expansion of Cement Plant: Cement - 2.5 Million TPA to 6.5 Million TPA with no… — cleared for impact study, 4.3 km away
- Amendment in Environmental Clearance of 2G and 1G Ethanol Plants (100 KLPD… — returned to applicant, 7.3 km away
More from Bishnu Rout in Bargarh
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — lapsed
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.