Quick answers
What is this project?
Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Ambapali O.S. Shop of M/S Sunil Kumar is a proposed industrial project in Gudesira, Bargarh Sadar, Bargarh, Odisha. The site covers 1.4 acres.
Who is building it?
The applicant is Sunil Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Gudesira, Bargarh Sadar, Bargarh, Odisha.
How big is it?
It has a stated cost of ₹50 lakh and a site of 1.4 acres.
When was it filed?
The application was filed on 21 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 21 Nov 2026 |
| Application filed | 21 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sunil Kumar |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Gudesira |
| Taluk / tehsil | Bargarh Sadar |
| District | Bargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04949 |
In context
6 applications in Bargarh since January 2022 are in the same category (Industry): 2 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gudesira, Bargarh Sadar, Bargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — lapsed, 3.8 km away
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — lapsed, 3.8 km away
- Modification of Ec on the Basis of Replenishment Study Report of Sayan Zeera… — withdrawn, 3.8 km away
- Transfer of EC of TURUNGA ZEERA RIVER SAND BED over an area 12.20acres or… — lapsed, 4.7 km away
- Transfer of EC for Deogaon Zeera River Sand Bed over an area of 12.02 acres or… — lapsed, 4.8 km away
- Transfer EC of Khuntpali Ganjhiatikira Stone Quarry over an area of 3.37 Acres… — environmental approval granted, 5.1 km away
- Transfer EC of Khuntpali Ganjhiatikira Stone Quarry over an area of 3.37 Acres… — environmental approval granted, 5.1 km away
- New Proposal Fresh Ec of Khuntpali, Ganjhiatikra Stone Quarry Over an Area… — under environmental review, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.