Project details
| Official title | Proposal for grant transfer EC Banko Stone Quarry over an area 12.00Ac or 4.856He in Banko village Koira tahasil Sundargarh district Orissa |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Mar 2024 |
| Application filed | 16 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Neeraj Pandey |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Banko |
| Taluk / tehsil | Kamarposh Balang |
| District | Sundargarh |
| State | Odisha |
| Location from | Site area on record |
| Our reference | WID-OR-01069 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 16 Feb 2024 (this page) | Environmental approval granted | 12 acres | ₹3 lakh |
| Ownership transfer filed 18 Jan 2024 | Returned to applicant | 12 acres |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12 acres, this one is smaller than 77% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Banko, Kamarposh Balang, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grant transfer EC Banko Stone Quarry over an area 12.00Ac or 4.856He — returned to applicant, 0 m away
- Obtaining Ec of Sianbahal Stone Quarry Over an Area 12 Acres Or 4.856 Hectare — not approved, 8.7 km away
- Obtaining Ec of Sianbahal Stone Quarry Over an Area 12 Acres Or 4.856 Hectare — environmental approval granted, 8.7 km away
- Grant of Ec of Sianbahal Stone Quarry Based on Modified Mining Plan(Without… — environmental approval granted, 8.7 km away
- Water Pipeline Project Which Includes Water Intake System and Underground… — forest land use approved, 10.3 km away
- Water Pipeline Project which includes Water intake system and Underground… — more information requested, 11.1 km away
- 33KV Power Transmission Line From K-Balanga Pss Grid 33/11KV Electrical… — forest land use approved, 12.6 km away
- Obtaining EC of Thelakudar Stone Quarry-1 over 10.00Acres or 4.05Hc — lapsed, 15.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.