Quick answers
What is this project?
Jambhira River Sand Bed, Bachhuripal over an area of 12.35 acres or 4.99 hectares is an approved mining project in Bachhuripal, Rasagobindapur, Mayurbhanj, Odisha. The site covers 12.3 acres.
Who is building it?
The applicant is Gideon Simons.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jan 2025), as of 27 Nov 2026.
Where is it?
In Bachhuripal, Rasagobindapur, Mayurbhanj, Odisha.
How big is it?
It has a stated cost of ₹2 lakh and a site of 12.3 acres.
When was it filed?
The application was filed on 31 Mar 2024.
Project details
| Official title | Jambhira River Sand Bed, Bachhuripal over an area of 12.35 acres or 4.99 hectares in village Bachhuripal under Rasgobindpur Tahasil in Mayurbhanj District, Odisha. |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Jan 2025 |
| Application filed | 31 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Gideon Simons |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Bachhuripal |
| Taluk / tehsil | Rasagobindapur |
| District | Mayurbhanj |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01118 |
In context
150 applications in Mayurbhanj since January 2022 are in the same category (Mining): 74 approved, 15 filed or under review, and 61 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.3 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Bachhuripal, Rasagobindapur, Mayurbhanj, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application Submission for Environment Clearance of Jambhira River Sand Bed,… — under environmental review, 3.1 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted, 3.1 km away
- Jambhira River Sand Bed, Stretch No-07 over an area of 12.35 acres or 5.00… — lapsed, 3.1 km away
- Ramachandrapur-Vedisahi Jambhira River Sand Bed over an area of 12.35 acres or… — not approved, 4.2 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted, 4.2 km away
- Application Submission for Environment Clearance of Jambhira River Sand Bed,… — under environmental review, 7.5 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted, 7.5 km away
- Jambhira River Sand Bed, Stretch No-06 Over an area of 12.35 Acres or 5.00… — not approved, 7.5 km away
More from Gideon Simons in Mayurbhanj
- Application Submission for Environment Clearance of Jambhira River Sand Bed,… — under environmental review
- Dighi-II Sand Bed over an area of 12.30 Acres or 4.977 hectares — lapsed
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted
- Jambhira River Sand Bed, Stretch No-07 over an area of 12.35 acres or 5.00… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.