Ramachandrapur-Vedisahi Jambhira River Sand Bed over an area of 12.35 acres or 5.00 hectares is a rejected mining project in Ramchandrapur, Rasagobindapur, Mayurbhanj, Odisha. The site covers 12.4 acres.
Who is building it?
The applicant is Atanu Paul.
Has it been approved?
No. The application was rejected on 27 Aug 2024.
Where is it?
In Ramchandrapur, Rasagobindapur, Mayurbhanj, Odisha.
How big is it?
It has a stated cost of ₹2 lakh and a site of 12.4 acres.
When was it filed?
The application was filed on 14 Apr 2024.
Project details
| Official title | Ramachandrapur-Vedisahi Jambhira River Sand Bed over an area of 12.35 acres or 5.00 hectares in village Ramachandrapur & Vedisahi under Rasgobindpur Tahasil in Mayurbhanj District, Odisha. |
|---|---|
| Status | Not approved |
| Status since | 27 Aug 2024 |
| Application filed | 14 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Atanu Paul |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Ramchandrapur |
| Taluk / tehsil | Rasagobindapur |
| District | Mayurbhanj |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01154 |
In context
150 applications in Mayurbhanj since January 2022 are in the same category (Mining): 74 approved, 15 filed or under review, and 61 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.4 acres, this one is larger than 68% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 24.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Ramchandrapur, Rasagobindapur, Mayurbhanj, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted, 150 m away
- Jambhira River Sand Bed, Bachhuripal over an area of 12.35 acres or 4.99… — environmental approval granted, 4.2 km away
- Badampur Jambhira River Sand Bed over an area of 11.03 acres or 4.463 hectares — lapsed, 5.8 km away
- Application Submission for Environment Clearance of Jambhira River Sand Bed,… — under environmental review, 7.3 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted, 7.3 km away
- Jambhira River Sand Bed, Stretch No-07 over an area of 12.35 acres or 5.00… — lapsed, 7.3 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — not approved, 8 km away
- Submission of Replenishment Study Report (2024-25) for Amendment of… — not approved, 8 km away
More from Atanu Paul in Mayurbhanj
- Submission of Replenishment Study Report (2024-25) for Amendment of… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.