Project details
| Official title | Proposal for Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand Quarry Over an Area 11.50acres Or 4.653ha in Goppur Village Under Biramitrapur Tahasil of Sundargarh District Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 Mar 2025 |
| Application filed | 26 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Prafulla Mahato |
| Land area | 11.5 acres (4.7 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Gopapur |
| Taluk / tehsil | Hatibari |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01124 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Oct 2024 (this page) | Environmental approval granted | 11.5 acres | ₹4 lakh |
| Amendment filed 3 Jul 2024 | Environmental approval granted | 11.5 acres | ₹4 lakh |
| Amendment filed 21 Apr 2024 | Not approved | 11.5 acres | |
| Amendment filed 1 Mar 2024 | Lapsed | 11.5 acres | ₹4 lakh |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.5 acres, this one is smaller than 82% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gopapur, Hatibari, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — environmental approval granted, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — lapsed, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — not approved, 100 m away
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — not approved, 6.4 km away
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — lapsed, 6.4 km away
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — not approved, 6.4 km away
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — lapsed, 6.4 km away
- Extension of validity of EC of Dumangdiri Stone Quarry-IV over an area of… — initial checks, 11.4 km away
More from Prafulla Mahato in Sundargarh
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — not approved
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — lapsed
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — not approved
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.