One of 4 filings for this project. The project's main page, with every filing and where each stands: Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand Quarry Over…
Project details
| Official title | Proposal for Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand Quarry Over an Area 11.90acres Or 4.815ha in Lankoi Village Under Biramitrapur Tahasil of Sundargarh District Odisha |
|---|---|
| Status | Not approved |
| Status since | 9 Aug 2024 |
| Application filed | 20 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Prafulla Mahato |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Lankoi |
| Taluk / tehsil | Bisra |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01537 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 28 Jan 2025 | Not approved | 11.9 acres | ₹3 lakh |
| Amendment filed 3 Jul 2024 | Lapsed | 11.9 acres | ₹3 lakh |
| Amendment filed 20 Apr 2024 (this page) | Not approved | 11.9 acres | ₹3 lakh |
| Amendment filed 2 Mar 2024 | Lapsed | 11.9 acres | ₹3 lakh |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.9 acres, this one is smaller than 78% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Lankoi, Bisra, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — not approved, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — lapsed, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Lankoi Sand… — lapsed, 0 m away
- Amendment of Ec for Jabaghat Sand Bed Is — environmental approval granted, 5.6 km away
- Modification of Ec on the Basis of Replenishment Study Report of Jamsera-Ii… — environmental approval granted, 6.3 km away
- Modification of Ec on the Basis of Replenishment Study Report of Jamsera Sand… — withdrawn, 6.3 km away
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — not approved, 6.4 km away
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — environmental approval granted, 6.4 km away
More from Prafulla Mahato in Sundargarh
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — environmental approval granted
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — environmental approval granted
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — not approved
- Modification of Ec on the Basis of Replenishment Study Report of Goppur Sand… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.