Quick answers
What is this project?
Expansion of 1.2 MTPA Iron Ore Beneficiation Plant to Final Capacity of 2.4 MTPA Iron Ore Beneficiation Plant, 1.2 MTPA Pellet Plant, 0.396 MTPA DRI, 2x9 MVA SAF Ferro Alloys Plant, 6 x 4500 Nm3/hr Producer Gas Plant and 48 MW Captive Power Plant (WHRB- 28 MW, CFBC- 20 MW) by M/S SSAB Energy and Minerals Limited is a lapsed industrial project in Dhanurjaypur, Bolani, Kendujhar, Odisha. The site covers 124.7 acres.
Who is building it?
The applicant is Ssab Energy and Minerals Limited.
Has it been approved?
No. The application was lapsed on 10 Dec 2024, so it is no longer under consideration.
Where is it?
In Dhanurjaypur, Bolani, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹799 crore and a site of 124.7 acres.
When was it filed?
The application was filed on 11 Sept 2024.
Project details
| Official title | Expansion of 1.2 MTPA Iron Ore Beneficiation Plant to Final Capacity of 2.4 MTPA Iron Ore Beneficiation Plant, 1.2 MTPA Pellet Plant, 0.396 MTPA DRI, 2x9 MVA SAF Ferro Alloys Plant, 6 x 4500 Nm3/hr Producer Gas Plant and 48 MW Captive Power Plant (WHRB- 28 MW, CFBC- 20 MW), at Village- Dhanurjayapur, Tehsil – Horomoto, District – Keonjhar, Odisha by M/S SSAB Energy and Minerals Limited. |
|---|---|
| Status | Lapsed |
| Status since | 10 Dec 2024 |
| Application filed | 11 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ssab Energy and Minerals Limited |
| Land area | 124.7 acres (50.5 ha) |
| Project cost | ₹799 crore |
| Village / locality | Dhanurjaypur |
| Taluk / tehsil | Bolani |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01301 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 124.7 acres, this one is larger than 50% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhanurjaypur, Bolani, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed for Enhancement of Beneficiation Plant Production Capacity with… — initial checks, 100 m away
- Laserda-Pacheri Manganese and Iron Ore Block of M/s. Thriveni Earthmovers Pvt.… — environmental approval granted, 2.6 km away
- Diversion of Forest Land for non forest purpose for construction of 132 KV… — more information requested, 5.2 km away
- Environment Clearance for Kendudihi North Iron Ore Block Mining Lease for 2.6… — environmental approval granted, 5.4 km away
- Environment Clearance for Kendudihi North Iron Ore Block Mining Lease for 2.6… — cleared for impact study, 5.4 km away
- Diversion of 135.980 ha. of Forest Land (130.603 ha. Forest Land within Mining… — in-principle approval, conditions pending, 5.5 km away
- Diversion of Forest land over 4.215 Ha for proposed 132kV DC Transmission line… — under forest review, 5.6 km away
- 33KV New Line Contruction BRPL chowk (Tanto) to Rugudi pss in NH-520 — more information requested, 6.2 km away
More from Ssab Energy and Minerals Limited in Kendujhar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.