Quick answers
What is this project?
33KV New Line Contruction BRPL chowk (Tanto) to Rugudi pss in NH-520 is a proposed road project in Sidhan>Tha Reserved Forest, Barbil, Kendujhar, Odisha. The site covers 1.6 acres.
Who is building it?
The applicant is Tp Northen Odisha Distribution Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sidhan>Tha Reserved Forest, Barbil, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 1.6 acres and 1.6 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 28 Apr 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 28 Apr 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Tp Northen Odisha Distribution Limited |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 1.6 acres (0.7 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Sidhan>Tha Reserved Forest |
| Taluk / tehsil | Barbil |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04162 |
In context
13 applications in Kendujhar since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 1.6 acres, this one is smaller than 91% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sidhan>Tha Reserved Forest, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for non forest purpose for construction of 132 KV… — more information requested, 1.1 km away
- Diversion of 0.928 Ha Forest Land for Road Connectivity Adjoining the Western… — lapsed, 1.4 km away
- Diversion of Forest land over 4.215 Ha for proposed 132kV DC Transmission line… — under forest review, 1.5 km away
- Roida-I Iron Ore and Manganese Block for Mining of 3 Mtpa Iron Ore Mineral — lapsed, 2.1 km away
- Transfer of Environment Clearance for Production of 3.5 Mtpa Iron Ore From… — environmental approval granted, 2.8 km away
- Diversion of 7.576 Ha (4.435 Ha. for mining and ancillary activities and… — lapsed, 2.8 km away
- Diversion of 7.576 Ha forest land involved in the ML area of Roida II Iron Ore… — lapsed, 2.8 km away
- Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant by M/s Narbheram Power and Steel… — cleared for impact study, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.