Integrated Steel Plant[sponge Iron Plant(2,70,000tpa), Steel Billet ( 2,68,300 Tpa , Pig Iron (1,10,000 Tpa) is a lapsed industrial project in Uchab>Li, Bamebari, Kendujhar, Odisha. The site covers 87 acres. Its stated project cost is ₹237 crore. As of 27 Nov 2026, its status is “Lapsed” (since 16 Feb 2026).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Integrated Steel Plant[sponge Iron Plant(2,70,000tpa), Steel Billet ( 2,68,300 Tpa , Pig Iron (1,10,000 Tpa) is a lapsed industrial project in Uchab>Li, Bamebari, Kendujhar, Odisha. The site covers 87 acres.

Who is building it?

The applicant is Mgm Minerals Limited.

Has it been approved?

No. The application was lapsed on 16 Feb 2026, so it is no longer under consideration.

Where is it?

In Uchab>Li, Bamebari, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹237 crore and a site of 87 acres.

When was it filed?

The application was filed on 10 Aug 2024.

Project details

Official titleIntegrated Steel Plant[sponge Iron Plant(2,70,000tpa), Steel Billet ( 2,68,300 Tpa , Pig Iron (1,10,000 Tpa) Along With Captive Power Plant (35 MW ; 20 MW Whrb & 15 MW Afbc)]
StatusLapsed
Status since16 Feb 2026
Application filed10 Aug 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantMgm Minerals Limited
Land area87 acres (35.2 ha)
Project cost₹237 crore
Village / localityUchab>Li
Taluk / tehsilBamebari
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01401

In context

38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 87 acres, this one is smaller than 61% of them.

19 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Uchab>Li, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mgm Minerals Limited in Kendujhar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.