Project details
| Official title | Expansion of Ore Processing plant producing Stone Chips , Stone dust , Sized Iron Ore and Iron Ore Fines for Production of Raw Mn Powder, Roasted Mn Powder, MnO, Al Notch bar & Al Allied Products, Chrome Refractory Mortar, Chrome Refractory Monolithic, Chrome Refractory Mortar bricks, Mn Briquettes, & Fe Powder along with installation of Ferro Alloy Plant for production of Medium Carbon Fe-Mn, Low Carbon Fe-Mn, Low Carbon Fe-Cr, Ferro Molybdenum, Ferro Vanadium & Ferro Titanium |
|---|---|
| Status | Cleared for impact study |
| Status since | 1 Aug 2024 |
| Application filed | 18 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Maruti Ores and Minerals |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹2 crore |
| Village / locality | Purukapali |
| Taluk / tehsil | Kutra |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01499 |
In context
57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.1 acres, this one is smaller than 82% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Purukapali, Kutra, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ferro Alloy Plant for production of Medium Carbon Ferro Manganese (6000 TPA),… — cleared for impact study, 50 m away
- Expansion of Integrated Steel Plant from 0.067 to 0.378 MTPA at Unit-II,… — environmental approval granted, 2.7 km away
- Proposed for Change in Plant Configuration and Production Capacity From Dri… — initial checks, 3 km away
- Amendment in Environmental Clearance in Specific Condition No. (i) of the EC… — environmental approval granted, 6.7 km away
- New proposed project of Litibeda Limestone & Dolomite Mine with proposed… — lapsed, 11.4 km away
- Expansion of Khatkurbahal (North) Block, ML Area: 156.43 ha) with production… — environmental approval granted, 14.9 km away
- Expansion of Khatkurbahal (North) Block, ML Area: 156.43 ha) with production… — cleared for impact study, 15 km away
- Proposed for change in configuration and capacity from DRI - (4x100 TPD +2x350… — initial checks, 17.7 km away
More from Maruti Ores and Minerals in Sundargarh
- Ferro Alloy Plant for production of Medium Carbon Ferro Manganese (6000 TPA),… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.