Quick answers
What is this project?
Application for Environmental Clearence of proposed construction road metals from Jogiapalli Stone Quarry Over an area of 4.046 Ha. or 10.00 Acre in Khata No.- 363, Plot No.- 120 is an approved mining project in Jogiapalli, Brahmapur Sadar, Ganjam, Odisha. The site covers 10 acres.
Who is building it?
The applicant is Mirza Abrarul Baig.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 May 2024), as of 27 Nov 2026.
Where is it?
In Jogiapalli, Brahmapur Sadar, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹40 lakh and a site of 10 acres.
When was it filed?
The application was filed on 5 Feb 2024.
Project details
| Official title | Application for Environmental Clearence of proposed construction road metals from Jogiapalli Stone Quarry Over an area of 4.046 Ha. or 10.00 Acre in Khata No.- 363, Plot No.- 120 in Village/ Mouza- Jogiapalli, Tahasil- Kukudakhandi, District- Ganjam in favor of Sri Mirza Abrarule Haque Baig |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 May 2024 |
| Application filed | 5 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mirza Abrarul Baig |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Jogiapalli |
| Taluk / tehsil | Brahmapur Sadar |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01500 |
In context
235 applications in Ganjam since January 2022 are in the same category (Mining): 134 approved, 18 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Jogiapalli, Brahmapur Sadar, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gurunthi Brick Earth Quarry over an area of 1.688 acres or 0.683 hectares… — environmental approval granted, 1.8 km away
- Fresh EC for Production of 1.0 KLD mahua flower based out still country liquor… — environmental approval granted, 2.3 km away
- Extension of Validity of EC for Production of 1.0 KLD mahua flower based out… — not approved, 2.3 km away
- Extension of Validity of EC for Production of 1.0 KLD mahua flower based out… — environmental approval granted, 2.3 km away
- Extension of Validity of EC for Production of 1.0 KLD mahua flower based out… — environmental approval granted, 2.3 km away
- Extension of Validity of Environmental Clearance for Production of Country… — more information requested, 3.7 km away
- Extension of Validity of Environmental Clearance for Production of Country… — not approved, 3.7 km away
- Extension of Validity of Environmental Clearance for Production of Country… — environmental approval granted, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.