Quick answers
What is this project?
Extension of Validity of EC for Production of 1.0 KLD mahua flower based out still country liquor manufacturing unit of M/s Borigaon Main O.S Shop at- Borigaon, Tahasil- Kukudakhandi, Dist.- Ganjam of Sri Rajendra Kumar Patro is an approved industrial project in Borigan, Brahmapur Sadar, Ganjam, Odisha. The site covers 0.3 acres.
Who is building it?
The applicant is Rajendra Kumar Patra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Mar 2025), as of 27 Nov 2026.
Where is it?
In Borigan, Brahmapur Sadar, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹20 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 15 Jan 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Extension of Validity of EC for Production of 1.0 KLD mahua flower based out still…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Mar 2025 |
| Application filed | 15 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Rajendra Kumar Patra |
| Land area | 1,200 m² |
| Project cost | ₹20 lakh |
| Village / locality | Borigan |
| Taluk / tehsil | Brahmapur Sadar |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02050 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 10 Jul 2026 | Not approved | 0.3 acres | ₹10 lakh |
| Validity extension filed 18 Aug 2025 | Environmental approval granted | 0.3 acres | ₹10 lakh |
| Validity extension filed 15 Jan 2025 (this page) | Environmental approval granted | 0.3 acres | ₹20 lakh |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 72% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borigan, Brahmapur Sadar, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Fresh EC for Production of 1.0 KLD mahua flower based out still country liquor… — environmental approval granted, 0 m away
- Extension of Validity of EC for Production of 1.0 KLD mahua flower based out… — not approved, 0 m away
- Extension of Validity of EC for Production of 1.0 KLD mahua flower based out… — environmental approval granted, 0 m away
- Application for Environmental Clearence of proposed construction road metals… — environmental approval granted, 2.3 km away
- Extension of Validity of Environmental Clearance for Production of Country… — more information requested, 2.8 km away
- Extension of Validity of Environmental Clearance for Production of Country… — not approved, 2.8 km away
- Extension of Validity of Environmental Clearance for Production of Country… — environmental approval granted, 2.8 km away
- Extension of Validity of Environmental Clearance for Production of Country… — environmental approval granted, 2.8 km away
More from Rajendra Kumar Patra in Ganjam
- Fresh EC for Production of 1.0 KLD mahua flower based out still country liquor… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.