Project details
| Official title | Proposal for Fresh EC of Kaimati Laterite Stone Quarry over an area of 2.43 Acres or 0.98 Hectares at village- Kaimati, Tahasil- Dhenkanal, District- Dhenkanal, Odisha. |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Jan 2026 |
| Application filed | 4 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bhagirathi Bantha |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Kaimati |
| Taluk / tehsil | Dhenkanal Sadar |
| District | Dhenkanal |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01538 |
In context
125 applications in Dhenkanal since January 2022 are in the same category (Mining): 75 approved, 9 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.4 acres, this one is smaller than 93% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Kaimati, Dhenkanal Sadar, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nochapali Laterite Stone Quarry Over an Area of 1.16acres Or 0.47 Ha Is — environmental approval granted, 1.1 km away
- Katakamada Road Metal Quarry No- 02 over an area of 8.50 Acre or 3.439 Ha… — not approved, 3.6 km away
- Katakamada Road Metal Quarry No- 02 over an area of 8.50 Acre or 3.439 Ha… — environmental approval granted, 3.6 km away
- KATAKAMADA ROAD METAL QUARRY No- 02 Over an area of 8.50 Acres 3.439 hect — not approved, 3.6 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review, 4 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study, 4 km away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — returned to applicant, 4 km away
- Proposed Integrated Solar Panel Manufacturing Unit — returned to applicant, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.