Project details
| Official title | Setting up of 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant at village Gajamara, district Dhenkanal, Odisha |
|---|---|
| Status | Returned to applicant |
| Status since | 21 Sept 2024 |
| Application filed | 14 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kalyani Steels LTD |
| Land area | 2,772.3 acres (1,121.9 ha) |
| Project cost | ₹11,058 crore |
| Village / locality | Talabarakot |
| Taluk / tehsil | Dhenkanal Sadar |
| District | Dhenkanal |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01074 |
In context
36 applications in Dhenkanal since January 2022 are in the same category (Industry): 8 approved, 18 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2,772.3 acres, this one is larger than 75% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talabarakot, Dhenkanal Sadar, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review, 0 m away
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study, 0 m away
- KATAKAMADA ROAD METAL QUARRY No- 02 Over an area of 8.50 Acres 3.439 hect — not approved, 2.4 km away
- Katakamada Road Metal Quarry No- 02 over an area of 8.50 Acre or 3.439 Ha… — not approved, 2.4 km away
- Katakamada Road Metal Quarry No- 02 over an area of 8.50 Acre or 3.439 Ha… — environmental approval granted, 2.4 km away
- For obtaining Forest Clearance for setting up Integrated Advanced Specialty… — in-principle approval, conditions pending, 2.9 km away
- Nochapali Laterite Stone Quarry Over an Area of 1.16acres Or 0.47 Ha Is — environmental approval granted, 3.4 km away
- Fresh EC of Kaimati Laterite Stone Quarry over an area of 2.43 Acres or 0.98… — environmental approval granted, 4 km away
More from Kalyani Steels LTD in Dhenkanal
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — under environmental review
- For obtaining Forest Clearance for setting up Integrated Advanced Specialty… — in-principle approval, conditions pending
- 1.43 MTPA Greenfield Integrated Advanced Specialty Steel Plant — cleared for impact study
- For obtaining Forest Clearance for setting up Integrated Advanced Specialty… — not approved
All 5 Kalyani Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.