Project details
| Official title | Establishment of 1.50 Million ton per annum (MTPA) capacity throughput of Iron Ore Beneficiation Plant at Village: Sonua, Tehsil: Koira in the District of Sundargarh, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Jul 2025 |
| Application filed | 26 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | S.P. Ispat Private Limited |
| Land area | 17.6 acres (7.1 ha) |
| Project cost | ₹45 crore |
| Village / locality | Sanua |
| Taluk / tehsil | Koida |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01605 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Dec 2024 (this page) | Environmental approval granted | 17.6 acres | ₹45 crore |
| Early planning filed 7 Jul 2023 | Cleared for impact study | 17.6 acres | ₹45 crore |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 17.6 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.
Where it is
Sanua, Koida, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 1.50 Million ton per annum (MTPA) capacity throughput of Iron Ore… — cleared for impact study, 0 m away
- Proposed 8,00,000 TPA (Throughput) Iron Ore Beneficiation plant, at: Village-… — under environmental review, 750 m away
- Proposed 8,00,000 TPA (Throughput) Iron Ore Beneficiation plant, at: Village-… — cleared for impact study, 750 m away
- Production of 1.0 Mtpa Iron Ore by Ragatradecon PVT LTD — environmental approval granted, 850 m away
- Chandiposhi Iron Ore Block — environmental approval granted, 1.5 km away
- FDP For Construction of 220/33KV Grid Substation — not approved, 1.8 km away
- DIVERSION OF 2.981 HA. FOREST LAND FOR CONSTRUCTION OF 33 KV OVERHEAD… — more information requested, 2 km away
- Environmental Clearance for proposed 12 MTPA (3 nos x 3 MTPA + 2 nos x 1.5… — environmental approval granted, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.