Quick answers
What is this project?
High Ash Coal to Ammonium Nitrate Plant for Bharat Coal Gasification and Chemicals Limited(BCGCL) is a proposed industrial project in Lakhanpur, Jharsuguda, Odisha. The site covers 350 acres.
Who is building it?
The applicant is Bharat Coal Gasification and Chemicals Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 Mar 2025), as of 27 Nov 2026.
Where is it?
In Lakhanpur, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹250.2 crore and a site of 350 acres.
When was it filed?
The application was filed on 2 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: High Ash Coal to Ammonium Nitrate Plant for Bharat Coal Gasification and Chemicals…
Project details
| Official title | Setting Up of High Ash Coal to Ammonium Nitrate Plant for Bharat Coal Gasification and Chemicals Limited(BCGCL) |
|---|---|
| Status | Cleared for impact study |
| Status since | 4 Mar 2025 |
| Application filed | 2 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bharat Coal Gasification and Chemicals Limited |
| Land area | 350 acres (141.6 ha) |
| Project cost | ₹250.2 crore |
| Village / locality | Lakhanpur |
| Taluk / tehsil | Lakhanpur |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01637 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Dec 2025 | Environmental approval granted | 350 acres | ₹250.2 crore |
| Early planning filed 2 Sept 2024 (this page) | Cleared for impact study | 350 acres | ₹250.2 crore |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 350 acres, this one is larger than 84% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lakhanpur, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (14 km away).
Other projects nearby
- High Ash Coal to Ammonium Nitrate Plant for Bharat Coal Gasification and… — environmental approval granted, 0 m away
- Integrated Lakhanpur Belpahar Lilari Opencast Project — environmental approval granted, 3.8 km away
- Integrated Lakhanpur Belpahar Lilari Project — environmental approval granted, 3.8 km away
- Integrated Lakhanpur Belpahar Lilari Project — environmental approval granted, 3.8 km away
- Integrated Lakhanpur Belpahar Lilari Opencast Project — environmental approval granted, 3.9 km away
- Lakhanpur Opencast Expansion Project — environmental approval granted, 4.4 km away
- Expansion of Coal Based Thermal Power Plant by addition of 2x660 MW (Unit 5 &… — cleared for impact study, 5.8 km away
- Expansion of Coal Based Thermal Power Plant by addition of 2x660 MW (Unit 5 &… — environmental approval granted, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.