Quick answers
What is this project?
Proposed Expansion of 1200 MW to 2000 MW by Installing 1x800 MW plant unit is a proposed power project in Ghantianali, Kaniha, Anugul, Odisha. The site covers 950 acres.
Who is building it?
The applicant is Jindal India Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Ghantianali, Kaniha, Anugul, Odisha.
How big is it?
It has a stated cost of ₹14,600 crore and a site of 950 acres.
When was it filed?
The application was filed on 19 Aug 2025.
Project details
| Official title | Proposed Expansion of 1200 MW to 2000 MW by Installing 1x800 MW plant unit at Village-Derang, Post-Kaniha, District-Angul, State-Odisha |
|---|---|
| Status | Returned to applicant |
| Status since | 8 Sept 2025 |
| Application filed | 19 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Jindal India Power Limited |
| Land area | 950 acres (384.5 ha) |
| Project cost | ₹14,600 crore |
| Village / locality | Ghantianali |
| Taluk / tehsil | Kaniha |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01853 |
In context
17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 950 acres, this one is larger than 50% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghantianali, Kaniha, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Name Change in Environment Clearance (EC) Letter due to Change in Name of the… — environmental approval granted, 100 m away
- Expansion of Existing 1200MW by adding 3rd and 4th Unit of 660 MW ULTRA… — lapsed, 850 m away
- Modification of Ec on the Basis of Replenishment Study Report of Kampasala… — environmental approval granted, 2.7 km away
- Modification of Ec on the Basis of Replenishment Study Report of Kampasala… — not approved, 2.7 km away
- Derenga Sand Quarry — environmental approval granted, 3.9 km away
- Derenga & Khajuria Sand Quarries Cluster Over an Area of 30.0 Acres Or 12.14… — lapsed, 3.9 km away
- Takua Sand Quarry over 8.30 ha onTikira River — cleared for impact study, 5.8 km away
- Takua Sand Quarry over 8.30 ha onTikira River — under environmental review, 5.8 km away
More from Jindal India Power Limited in Anugul
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.