Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant by M/s Narbheram Power and Steel Private Limited is a proposed mining project in Tantyo, Barbil, Kendujhar, Odisha. The site covers 17.5 acres.
Who is building it?
The applicant is Narbheram Power and Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Jun 2026), as of 27 Nov 2026.
Where is it?
In Tantyo, Barbil, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹350 crore and a site of 17.5 acres.
When was it filed?
The application was filed on 6 Nov 2025.
Project details
| Official title | Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant along with Producer Gas Plant (PGP) of 5 x 6,500 Nm3/hr configuration over an area of 7.074 ha (17.48 Acres) at village – Tanto, tehsil – Barbil, district – Keonjhar, Odisha by M/s Narbheram Power and Steel Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Jun 2026 |
| Application filed | 6 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Narbheram Power and Steel Private Limited |
| Land area | 17.5 acres (7.1 ha) |
| Project cost | ₹350 crore |
| Village / locality | Tantyo |
| Taluk / tehsil | Barbil |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01978 |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 17.5 acres, this one is smaller than 59% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 36.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Tantyo, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 7.576 Ha forest land involved in the ML area of Roida II Iron Ore… — lapsed, 500 m away
- Diversion of 7.576 Ha (4.435 Ha. for mining and ancillary activities and… — lapsed, 550 m away
- Transfer of Environment Clearance for Production of 3.5 Mtpa Iron Ore From… — environmental approval granted, 600 m away
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed, 1.2 km away
- Roida-I Iron Ore and Manganese Block for Mining of 3 Mtpa Iron Ore Mineral — lapsed, 1.2 km away
- Diversion of 0.928 Ha Forest Land for Road Connectivity Adjoining the Western… — lapsed, 1.8 km away
- Kasia Iron Ore & Dolomite Mining and Beneficiation Plant Project — environmental approval granted, 2 km away
- Diversion of 3.999 Ha. Non-Forest Land Recorded As Forest As on 25.10.1980… — lapsed, 2 km away
More from Narbheram Power and Steel Private Limited in Kendujhar
- Laying of Water Pipeline from Village Kandra to Tanto for 2.4 MTPA Pallet… — lapsed
- Laying of Water Pipeline from Village Kandra to Tanto for 2.4 MTPA Pallet… — lapsed
- Diversion of 7.576 Ha (4.435 Ha. for mining and ancillary activities and… — lapsed
- Proposed 132 KV Transmission Line from 132/33 KV Grid substation at Barbil to… — lapsed
- Diversion of 7.576 Ha forest land involved in the ML area of Roida II Iron Ore… — lapsed
- Transfer of Environment Clearance for Production of 3.5 Mtpa Iron Ore From… — environmental approval granted
8 Narbheram Power and Steel projects in Kendujhar
All 9 Narbheram Power and Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.