What is Developing? Open the mapMap

Cleared for impact studyMining · Kendujhar, Odisha

Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant by M/s Narbheram Power and Steel Private Limited

Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant by M/s Narbheram Power and Steel Private Limited is a proposed mining project in Tantyo, Barbil, Kendujhar, Odisha. The site covers 17.5 acres. Its stated project cost is ₹350 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 Jun 2026).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant by M/s Narbheram Power and Steel Private Limited is a proposed mining project in Tantyo, Barbil, Kendujhar, Odisha. The site covers 17.5 acres.

Who is building it?

The applicant is Narbheram Power and Steel Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 2 Jun 2026), as of 27 Nov 2026.

Where is it?

In Tantyo, Barbil, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹350 crore and a site of 17.5 acres.

When was it filed?

The application was filed on 6 Nov 2025.

Project details

Official titleProposed 2.4 MTPA (1 x 2.4 MTPA) Pellet Plant along with Producer Gas Plant (PGP) of 5 x 6,500 Nm3/hr configuration over an area of 7.074 ha (17.48 Acres) at village – Tanto, tehsil – Barbil, district – Keonjhar, Odisha by M/s Narbheram Power and Steel Private Limited
StatusCleared for impact study
Status since2 Jun 2026
Application filed6 Nov 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantNarbheram Power and Steel Private Limited
Land area17.5 acres (7.1 ha)
Project cost₹350 crore
Village / localityTantyo
Taluk / tehsilBarbil
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01978

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 17.5 acres, this one is smaller than 59% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 36.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Tantyo, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Narbheram Power and Steel Private Limited in Kendujhar

8 Narbheram Power and Steel projects in Kendujhar
All 9 Narbheram Power and Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.