Project details
| Official title | Proposal for Modification of Ec on the Basis of Replenishment Study Report of Tainser Sand Quarry Over an Area 10.00acres Or 4.046ha Intainser Village Under Lathikata Tahasil of Sundargarh District Odisha |
|---|---|
| Status | Not approved |
| Status since | 28 Apr 2025 |
| Application filed | 13 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Debidutta Mohanty |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Timijore |
| Taluk / tehsil | Lathikata |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02058 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 9 May 2026 | Environmental approval granted | 10 acres | ₹5 lakh |
| Amendment filed 2 Apr 2025 | Environmental approval granted | 10 acres | ₹5 lakh |
| Amendment filed 13 Feb 2025 (this page) | Not approved | 10 acres | ₹5 lakh |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Timijore, Lathikata, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modification of Ec on the Basis of Replenishment Study Report of Tainser Sand… — environmental approval granted, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Tainser Sand… — environmental approval granted, 0 m away
- Modification of Ec on the Basis of Replenishment Study Report of Tainser Sand… — environmental approval granted, 0 m away
- Expansion Of DRI Plant [From 1,20,000 TPA (4 X 100 TPD) To 990000 TPA (4 X 100… — cleared for impact study, 1.6 km away
- Integrated Steel Plant (450000 TPA) with captive power plant — lapsed, 1.6 km away
- Modification of Ec on the Basis of Replenishment Study Report of Chhidi Sand… — environmental approval granted, 5 km away
- Modification of Ec on the Basis of Replenishment Study Report of Chhidi Sand… — not approved, 5 km away
- Modification of Ec on the Basis of Replenishment Study Report of Chhidi Sand… — environmental approval granted, 5 km away
More from Debidutta Mohanty in Sundargarh
- Extension of validity of EC of Narendra Sand Bed-2 over an area of 19.80 acres… — environmental approval granted
- Narendra Sand Bed - 2 (Area - 8.012 ha.) — environmental approval granted
- Modification of Ec on the Basis of Replenishment Study Report of Tainser Sand… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.