LapsedIndustry · Sundargarh, Odisha

Integrated Steel Plant (450000 TPA) with captive power plant

Integrated Steel Plant (450000 TPA) with captive power plant is a lapsed industrial project in Bagalata, Brahmani Tarang, Sundargarh, Odisha. The site covers 99 acres. Its stated project cost is ₹450 crore. As of 27 Nov 2026, its status is “Lapsed” (since 22 Jul 2026).

See it on the live map All projects in Sundargarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleIntegrated Steel Plant (450000 TPA) with captive power plant at village tainsor, tehsil Rourkela, District Sundergarh, Orrisa
StatusLapsed
Status since22 Jul 2026
Application filed19 Jun 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantJai Balaji Jyoti Steels Limited
Land area99 acres (40.1 ha)
Project cost₹450 crore
Village / localityBagalata
Taluk / tehsilBrahmani Tarang
DistrictSundargarh
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03260

In context

57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 99 acres, this one is larger than 68% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bagalata, Brahmani Tarang, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jai Balaji Jyoti Steels Limited in Sundargarh

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.