Quick answers
What is this project?
Validity Extension of Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Dengapadar O.S. Shop of Smt. Tapoi Mallik is an approved industrial project in Dengapadar, Brahmapur Sadar, Ganjam, Odisha. The site covers 1.5 acres.
Who is building it?
The applicant is Topai Mallik.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2025), as of 27 Nov 2026.
Where is it?
In Dengapadar, Brahmapur Sadar, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹10 lakh and a site of 1.5 acres.
When was it filed?
The application was filed on 22 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Validity Extension of Environmental Clearance for Production of Country Liquor From the…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2025 |
| Application filed | 22 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Topai Mallik |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Dengapadar |
| Taluk / tehsil | Brahmapur Sadar |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02228 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 19 May 2025 | Environmental approval granted | 1.5 acres | ₹10 lakh |
| Validity extension filed 22 Feb 2025 (this page) | Environmental approval granted | 1.5 acres | ₹10 lakh |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is larger than 92% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dengapadar, Brahmapur Sadar, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 0 m away
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 0 m away
- Sanaburuda Stone Quarry over an area of 22.90 acers or 9.2675 Ha having Khata… — cleared for impact study, 3.4 km away
- Transfer of Ec for Mahughara Decorative Stone Mine Over an Area of 7.50 Acres… — environmental approval granted, 4.4 km away
- Mahuhara Hill Stone Quarry Over an Area of 8.00 Acres Or 3.237 Hectares — lapsed, 4.5 km away
- MAHUHARA HILL STONE QUARRY OVER AN AREA OF 8.00 ACRES OR 3.237 HECTARES — withdrawn, 4.5 km away
- Grant of Ec of Mahugharahill Stone Quarryover 8.00acres/3.238 Hectares — lapsed, 4.6 km away
- Alarigada Brick Earth Quarry-I over an area of 2.360 acres or 0.955 hectares… — lapsed, 5.9 km away
More from Topai Mallik in Ganjam
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.