Quick answers
What is this project?
Validity Extension of Environmental Clearance for Production of Country Liquor From the Manufacturing Unit of M/S Dengapadar Main O.S. Shop of Smt. Tapoi Mallik is an approved industrial project in Dengapadar, Brahmapur Sadar, Ganjam, Odisha. The site covers 1.5 acres.
Who is building it?
The applicant is Topai Mallik.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Jun 2026), as of 27 Nov 2026.
Where is it?
In Dengapadar, Brahmapur Sadar, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹15 lakh and a site of 1.5 acres.
When was it filed?
The application was filed on 30 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Jun 2026 |
| Application filed | 30 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Topai Mallik |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Dengapadar |
| Taluk / tehsil | Brahmapur Sadar |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03246 |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is larger than 92% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dengapadar, Brahmapur Sadar, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 0 m away
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 0 m away
- Sanaburuda Stone Quarry over an area of 22.90 acers or 9.2675 Ha having Khata… — cleared for impact study, 3.4 km away
- Transfer of Ec for Mahughara Decorative Stone Mine Over an Area of 7.50 Acres… — environmental approval granted, 4.4 km away
- Mahuhara Hill Stone Quarry Over an Area of 8.00 Acres Or 3.237 Hectares — lapsed, 4.5 km away
- MAHUHARA HILL STONE QUARRY OVER AN AREA OF 8.00 ACRES OR 3.237 HECTARES — withdrawn, 4.5 km away
- Grant of Ec of Mahugharahill Stone Quarryover 8.00acres/3.238 Hectares — lapsed, 4.6 km away
- Alarigada Brick Earth Quarry-I over an area of 2.360 acres or 0.955 hectares… — lapsed, 5.9 km away
More from Topai Mallik in Ganjam
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.