Quick answers
What is this project?
Application for Extension of validity of Environmental Clearance for Production of 3.48 KLD Mahua Flower Based Out still Country Liquor Manufacturing unit of M/s Chhatrapur Main Out Still Liquor Shop At/ Ps/Po- Chhatrapur, District- Ganjam of the Licensee Sri. Damburudhar Sahu is an approved industrial project in Gedalanaidupalam, Chhatrapur, Ganjam, Odisha. The site covers 0.2 acres.
Who is building it?
The applicant is Damburudhar Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2025), as of 27 Nov 2026.
Where is it?
In Gedalanaidupalam, Chhatrapur, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹20 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 27 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Application for Extension of validity of Environmental Clearance for Production of 3.48…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2025 |
| Application filed | 27 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Damburudhar Sahu |
| Land area | 900 m² |
| Project cost | ₹20 lakh |
| Village / locality | Gedalanaidupalam |
| Taluk / tehsil | Chhatrapur |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02254 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 7 Jul 2025 | Environmental approval granted | 0.2 acres | ₹21 lakh |
| Validity extension filed 27 Feb 2025 (this page) | Environmental approval granted | 0.2 acres | ₹20 lakh |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 78% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gedalanaidupalam, Chhatrapur, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extension of validity of Environmental Clearance for Production of 3.48 KLD… — environmental approval granted, 0 m away
- Application for Extension of validity of Environmental Clearance for… — environmental approval granted, 0 m away
- Tourism Infrastructure at Tampara Lake of Chatrapur Tahsil under Ganjam… — lapsed, 2.4 km away
- Tourism Infrastructure at Tampara Lake of Chatrapur Tahsil under Ganjam… — lapsed, 2.5 km away
- Application for validity extension of EC for production of 2.532 KLD Mahua… — environmental approval granted, 4.3 km away
- Application for validity extension of EC for production of 2.532 KLD Mahua… — environmental approval granted, 4.3 km away
- Application for extension of EC for production of 2.532 KLD Mahua Flower based… — environmental approval granted, 4.3 km away
- Shore Protection Measures Along the Aryapalli Coastline at Northern Side of… — lapsed, 4.7 km away
More from Damburudhar Sahu in Ganjam
- Extension of validity of Environmental Clearance for Production of 3.48 KLD… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.