Quick answers
What is this project?
Shore Protection Measures Along the Aryapalli Coastline at Northern Side of Gopalpur Port, Odisha is a lapsed port and coastal project in Arjyapalli, Arjyapalli Marine, Ganjam, Odisha. The site covers 1.5 acres.
Who is building it?
The applicant is Trilochan Behera.
Has it been approved?
No. The application was lapsed on 22 Oct 2026, so it is no longer under consideration.
Where is it?
In Arjyapalli, Arjyapalli Marine, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹32 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 16 Jun 2026.
Project details
| Official title | Construction of Shore Protection Measures Along the Aryapalli Coastline at Northern Side of Gopalpur Port, Odisha. |
|---|---|
| Status | Lapsed |
| Status since | 22 Oct 2026 |
| Application filed | 16 Jun 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Trilochan Behera |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹32 crore |
| Village / locality | Arjyapalli |
| Taluk / tehsil | Arjyapalli Marine |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04792 |
In context
11 applications in Ganjam since January 2022 are in the same category (Ports & coast): 6 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 100% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arjyapalli, Arjyapalli Marine, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for validity extension of EC for production of 2.532 KLD Mahua… — environmental approval granted, 1.8 km away
- Application for validity extension of EC for production of 2.532 KLD Mahua… — environmental approval granted, 1.8 km away
- Application for extension of EC for production of 2.532 KLD Mahua Flower based… — environmental approval granted, 1.8 km away
- Submission of application for Extension validity of EC for 1X120 MW Coal Based… — under environmental review, 3.8 km away
- Proposed Floating Storage and Regasification Unit (FSRU) based LNG terminal… — lapsed, 4 km away
- Proposed Floating Storage and Regasification Unit (FSRU) based LNG terminal… — environmental approval granted, 4 km away
- Proposed Floating Storage and Regasification Unit (FSRU) based LNG terminal… — cleared for impact study, 4 km away
- Proposed Floating Storage and Regasification Unit (FSRU) based LNG terminal… — under coastal review, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.