Quick answers
What is this project?
Application for validity Extension of Environmental Clearance (EC) of 1.266 KLD Mahua Flower Based Country Liquor Manufacturing Unit M/s Karachuli Main Out Still Shop at Karachuli, Mauza- Gahanapali, Tahasil- Buguda, Dist- Ganjam in favour of Smt. Namita Kumari Biswal is an approved industrial project in Karachuli, Buguda, Ganjam, Odisha. The site covers 0.1 acres.
Who is building it?
The applicant is Namita Kumari Biswal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2025), as of 27 Nov 2026.
Where is it?
In Karachuli, Buguda, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹15 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 4 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2025 |
| Application filed | 4 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Namita Kumari Biswal |
| Land area | 500 m² |
| Project cost | ₹15 lakh |
| Village / locality | Karachuli |
| Taluk / tehsil | Buguda |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02307 |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 85% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karachuli, Buguda, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for validity Extension of Environmental Clearance (EC) of 1.266… — environmental approval granted, 0 m away
- Industrial project by Tarangini Distilleries Private Limited — environmental approval granted, 700 m away
- 765KV D/C Angul (Powergrid)-Gopalpur Transmission Line — under forest review, 9.2 km away
- Application for validity extension of Environmental Clearance for production… — environmental approval granted, 15 km away
- Application for validity extension of Environmental Clearance for production… — environmental approval granted, 15 km away
- Extension of Validity of Ec of Betarsingi Stone Quarry Over an Area of 5.440… — lapsed, 15.3 km away
- Kaniapali Stone Quarry over an area of 4.880 acres or 1.974 hectares bearing… — not approved, 16.2 km away
- Dhunkapara Decorative Stone Mines over an area of 17.530 Ha or 43.32 Acres… — under environmental review, 16.8 km away
More from Namita Kumari Biswal in Ganjam
- Application for validity Extension of Environmental Clearance (EC) of 1.266… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.