Project details
| Official title | Expansion in Bauxite Production Capacity from 3.6 Million TPA to 6.0 Million TPA [ROM: 6.0 Million TPA, OB/Waste: 3.29 Million TPA, Top Soil: 0.22 Million TPA (Total Excavation: 9.51 Million TPA)] in Kodingamali Bauxite Mine (ML Area: 428.075 ha) located at Village: Kodingamali, Tehsil: Laxmipur & Kashipur, District: Koraput & Rayagada, State: Odisha by M/s. Odisha Mining Corporation Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 20 Jun 2025 |
| Application filed | 7 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Odisha Mining Corporation Limited |
| Land area | 1,057.8 acres (428.1 ha) |
| Project cost | ₹55 crore |
| Village / locality | Forest |
| Taluk / tehsil | Lakshmipur |
| District | Koraput |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02362 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 22 Aug 2026 | Under environmental review | 1,057.8 acres | ₹55 crore |
| Early planning filed 7 May 2025 (this page) | Cleared for impact study | 1,057.8 acres | ₹55 crore |
In context
151 applications in Koraput since January 2022 are in the same category (Mining): 96 approved, 14 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,057.8 acres, this one is larger than 92% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Forest, Lakshmipur, Koraput, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Bauxite Production Capacity from 3.6 Million TPA to 6.0 Million… — under environmental review, 0 m away
- Kodingamali Bauxite Mine (ML Area: 428.075 ha) with Expansion in Bauxite… — environmental approval granted, 0 m away
- Diversion of 1.598 Ha. forest area involved for construction of Long Distance… — lapsed, 4.4 km away
- Expansion of EC of Brahman Gurusi Stone Quarry over an area 5.00Ac or 2.023Ha — environmental approval granted, 21.4 km away
- Modification EC of Brahman Gurusi Stone Quarry over an area 5.00Ac or 2.023Ha — returned to applicant, 21.4 km away
- Expansion EC of Kataguda Stone Quarry over an area 3.00Ac or 1.214Ha — environmental approval granted, 23.3 km away
- Modification EC of Kataguda Stone Quarry over an area 3.00Ac or 1.214Ha — returned to applicant, 23.3 km away
- Amendment to Environmental Clearance for Establishing a New Crusher of… — lapsed, 23.3 km away
More from Odisha Mining Corporation Limited in Koraput
- Kodingamali Bauxite Mine (ML Area: 428.075 ha) with Expansion in Bauxite… — environmental approval granted
- Umpavally Limestone Mines — forest land use approved
4 Odisha Mining Corporation projects in Koraput
All 41 Odisha Mining Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.