Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Nov 2025 |
| Application filed | 1 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Odisha Mining Corporation Limited |
| Land area | 3,213.1 acres (1,300.3 ha) |
| Forest land | 21.6 acres (8.8 ha) |
| Project cost | ₹13.5 crore |
| Village / locality | Kataba |
| Taluk / tehsil | Pottangi |
| District | Koraput |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04114 |
In context
151 applications in Koraput since January 2022 are in the same category (Mining): 96 approved, 14 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3,213.1 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kataba, Pottangi, Koraput, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance letter No. J-11011/48/2008-IA.II(I) dated… — under environmental review, 2.5 km away
- Kurli Decorative Stone Mine Over an Area of 32.865 Acres Or 13.300 Hectares — environmental approval granted, 4.7 km away
- Kurli Decorative Stone Mine Over an Area of 32.865 Acres Or 13.300 Hectares — cleared for impact study, 4.7 km away
- Proposed Greenfield Cement Plant of 2.0 Million TPA of Clinker Production &… — more information requested, 6.2 km away
- Application of EC for Production of 1.35 KLD Mohua Flower Based Out Still… — environmental approval granted, 19 km away
- Proposed Intake Water Pipeline Corridor for proposed Pottangi Bauxite Mines of… — forest land use approved, 22.1 km away
- Road from Pottangi Bauxite Mines to Alumina Refinery at Damanjodi — forest land use approved, 23 km away
- Proposed Bauxite Mining with production capacity of 3.5 Million TPA by… — environmental approval granted, 23.2 km away
More from Odisha Mining Corporation Limited in Koraput
- Expansion in Bauxite Production Capacity from 3.6 Million TPA to 6.0 Million… — under environmental review
- Expansion in Bauxite Production Capacity from 3.6 Million TPA to 6.0 Million… — cleared for impact study
- Kodingamali Bauxite Mine (ML Area: 428.075 ha) with Expansion in Bauxite… — environmental approval granted
4 Odisha Mining Corporation projects in Koraput
All 41 Odisha Mining Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.