Quick answers
What is this project?
Validity extension of environmental Clearance (EC) for production of 3.791KLD Mahua Flower based country liquor manufacturing unit M/s Kodala Main Out Still Liquor Shop is an approved industrial project in Kodala Town, Kodala, Ganjam, Odisha. The site covers 0 acres.
Who is building it?
The applicant is Susama Panigrahy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Sept 2025), as of 27 Nov 2026.
Where is it?
In Kodala Town, Kodala, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹25 lakh and a site of 0 acres.
When was it filed?
The application was filed on 22 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Validity extension of environmental Clearance (EC) for production of 3.791KLD Mahua…
Project details
| Official title | Proposal for validity extension of environmental Clearance (EC) for production of 3.791KLD Mahua Flower based country liquor manufacturing unit M/s Kodala Main Out Still Liquor Shop in village- Kodala, Tahasil- Beguniapada, Dist.- Ganjam in favour of Smt Susama Panigrahi. |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Sept 2025 |
| Application filed | 22 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Susama Panigrahy |
| Land area | 200 m² |
| Project cost | ₹25 lakh |
| Village / locality | Kodala Town |
| Taluk / tehsil | Kodala |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02461 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 24 Apr 2026 | Environmental approval granted | 0 acres | ₹25 lakh |
| Validity extension filed 22 Aug 2025 (this page) | Environmental approval granted | 0 acres | ₹25 lakh |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 95% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kodala Town, Kodala, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Validity extension of environmental Clearance (EC) for production of 1.58 KLD… — environmental approval granted, 0 m away
- Validity extension of environmental Clearance (EC) for production of 3.791KLD… — environmental approval granted, 0 m away
- Rengitipalli - A,b,c,d & E Stone Quarries Cluster Over an Area of 170.249… — more information requested, 3.6 km away
- Extension of EC for Production of 1.0 KLD Mahua Flower Based Country Liquor… — environmental approval granted, 6.4 km away
- Extension of EC for Production of 1.0 KLD Mahua Flower Based Country Liquor… — environmental approval granted, 6.4 km away
- Extension of validity of Environmental Clearance for Production of 1.896 KLD… — not approved, 8.2 km away
- Extension of Validity of Ec of Tiridabanjara - B Stone Quarry Over an Area of… — lapsed, 8.6 km away
- Production of 3.792 Kld Mahua Flower Based Out Still Country Liquor… — environmental approval granted, 9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.