What is this project?
EC Split of "Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from 3.1 MTPA to 21.1 MTPA is an approved industrial project in Barakerajang, Industrial, Anugul, Odisha. The site covers 10,456.1 acres.
Who is building it?
The applicant is Jindal Steel odisha Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jun 2025), as of 27 Nov 2026.
Where is it?
In Barakerajang, Industrial, Anugul, Odisha.
How big is it?
It has a stated cost of ₹1,257 crore and a site of 10,456.1 acres.
When was it filed?
The application was filed on 18 Jan 2025.
Project details
| Official title | EC Split of "Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from 3.1 MTPA to 21.1 MTPA along with setting up 19.2 MTPA Integrated Steel Plant and 12.5 MTPA Cement plant" between M/s Jindal Steel Odisha Limited & M/s Jindal Panther Cement Private Limited by transfer of 12.5 MTPA Cement plant to M/s Jindal Panther Cement Private Limited at Angul, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Jun 2025 |
| Application filed | 18 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Jindal Steel odisha Limited |
| Land area | 10,456.1 acres (4,231.5 ha) |
| Project cost | ₹1,257 crore |
| Village / locality | Barakerajang |
| Taluk / tehsil | Industrial |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02463 |
In context
17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 10,456.1 acres, this one is larger than 94% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barakerajang, Industrial, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from… — initial checks, 500 m away
- Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from… — environmental approval granted, 500 m away
- Change in Land Use Pattern for 6.682 Ha of Forest Land Diverted for Laying of… — under forest review, 2.2 km away
- Change in Land Use Pattern of 6.682 Hect. of Forest Land Diverted for Laying… — lapsed, 2.2 km away
- Change in Land Use Pattern of 6.682 Hect. of Forest Land Diverted for Laying… — lapsed, 2.2 km away
- Coal Washery (6.5 MTPA) located at Angul, Odisha — environmental approval granted, 2.3 km away
- Integrated Steel Plant (6 MTPA) and Captive Power Plant (810 MW) located at… — environmental approval granted, 2.5 km away
- Transfer of Environmental Clearance for 12.5 MTPA Cement Plant at Angul,… — under environmental review, 3.5 km away
More from Jindal Steel odisha Limited in Anugul
- Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from… — initial checks
- Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from… — environmental approval granted
All 3 Jindal Steel Odisha projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.