Quick answers
What is this project?
Integrated Steel Plant (6 MTPA) and Captive Power Plant (810 MW) located at Angul, Odisha is an approved industrial project in Bhubanapur, Industrial, Anugul, Odisha. The site covers 1,992 acres.
Who is building it?
The applicant is Jindal Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Jul 2026), as of 27 Nov 2026.
Where is it?
In Bhubanapur, Industrial, Anugul, Odisha.
How big is it?
It has a stated cost of ₹22,834 crore and a site of 1,992 acres.
When was it filed?
The application was filed on 8 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Jul 2026 |
| Application filed | 8 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Jindal Steel Limited |
| Land area | 1,992 acres (806.1 ha) |
| Project cost | ₹22,834 crore |
| Village / locality | Bhubanapur |
| Taluk / tehsil | Industrial |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03973 |
In context
17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1,992 acres, this one is larger than 76% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhubanapur, Industrial, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Coal Washery (6.5 MTPA) located at Angul, Odisha — environmental approval granted, 1.3 km away
- Change in Land Use Pattern for 6.682 Ha of Forest Land Diverted for Laying of… — under forest review, 1.4 km away
- Change in Land Use Pattern of 6.682 Hect. of Forest Land Diverted for Laying… — lapsed, 1.4 km away
- Change in Land Use Pattern of 6.682 Hect. of Forest Land Diverted for Laying… — lapsed, 1.4 km away
- EC Split of "Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot… — environmental approval granted, 2.5 km away
- New Proposal for Amendment Ec of Krushnachandrapur Stone Quarry No-6 Over an… — environmental approval granted, 2.9 km away
- Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from… — initial checks, 3 km away
- Expansion of Pellet Plant from 5.0 MTPA to 26.0 MTPA and Hot Rolling mill from… — environmental approval granted, 3 km away
More from Jindal Steel Limited in Anugul
- Amendment in Environmental Clearance of 2x525 MW coal based Thermal Power Plant — returned to applicant
- Utkal C coal mine (ML area: 575.071 ha) — under environmental review
- Change in Name of User Agency From M/S Jindal Steel & Power Limited to M/S… — initial checks
- Expansion of existing 2x525 MW by addition of 2x800 MW coal based Thermal… — returned to applicant
- Permission for Survey and Explorations for 26 boreholes in 1147.703Ha of… — forest land use approved
- Utkal C coal mine (ML area: 575.071 ha) — returned to applicant
18 Jindal Steel projects in Anugul
All 39 Jindal Steel projects across India
About this information