Quick answers
What is this project?
Proposed Environmental Clearance for the Construction of an Industrial Building to Establish a Food Processing Unit Located at Plot No. 7(P), Khata No. 456, Food Processing Park, Mouza – Mundaamba, Tehsil – Khordha, District – Khordha, State – Odisha, With a Total Plot Area of 80 Acres and a Total Built-Up Area of 48,476 Sqm., by M/S Nestlé India Limited is a lapsed building project in Mundaamba, Jankia, Khordha, Odisha. The site covers 80 acres.
Who is building it?
The applicant is Nestle India Limited.
Has it been approved?
No. The application was lapsed on 10 Sept 2026, so it is no longer under consideration.
Where is it?
In Mundaamba, Jankia, Khordha, Odisha.
How big is it?
It has a stated cost of ₹894.1 crore and a site of 80 acres.
When was it filed?
The application was filed on 2 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 2 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nestle India Limited |
| Land area | 80 acres (32.4 ha) |
| Project cost | ₹894.1 crore |
| Village / locality | Mundaamba |
| Taluk / tehsil | Jankia |
| District | Khordha |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02471 |
In context
167 applications in Khordha since January 2022 are in the same category (Buildings & townships): 103 approved, 31 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 80 acres, this one is larger than 97% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mundaamba, Jankia, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Capacity Expansion of Existing Fruit… — initial checks, 550 m away
- Environmental Clearance for Capacity Expansion of Existing Fruit Pulp/Juice -… — returned to applicant, 550 m away
- Proposed Environmental Clearance for an Industrial Building With Total… — not approved, 1.3 km away
- Proposed Environmental Clearance for an Industrial Building With Total… — environmental approval granted, 1.3 km away
- Industrial Shed of EPIC Apparel Manufacturing Industry by M/s Trimetro… — environmental approval granted, 1.7 km away
- Fresh EC of Mundamba Laterite Stone Quarry over an area of 2.00 Acres or 0.809… — environmental approval granted, 2.2 km away
- Proposed Greenfield Project of Integrated Paint and Coal Tar-Based Products… — more information requested, 2.2 km away
- Olasingh Laterite Stone Quarry (C) over an area of 12.35 acres or 5.00… — more information requested, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.