Quick answers
What is this project?
Environmental Clearance for Capacity Expansion of Existing Fruit Pulp/Juice-Based Drink, Carbonated Soft Drink and Packaged Drinking Water & Packaging Product Manufacturing Plant At- Mundaamba, Tehsil & District - Khordha, Odisha, by M/S. Varun Beverages Limited is a proposed building project in Kalibeti, Jankia, Khordha, Odisha. The site covers 40.9 acres.
Who is building it?
The applicant is Varun Beverages Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Kalibeti, Jankia, Khordha, Odisha.
How big is it?
It has a stated cost of ₹680.8 crore and a site of 40.9 acres.
When was it filed?
The application was filed on 6 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Capacity Expansion of Existing Fruit Pulp/Juice - Based…
Project details
| Status | Initial checks |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 6 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Varun Beverages Limited |
| Land area | 40.9 acres (16.6 ha) |
| Project cost | ₹680.8 crore |
| Village / locality | Kalibeti |
| Taluk / tehsil | Jankia |
| District | Khordha |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03912 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Oct 2026 (this page) | Initial checks | 40.9 acres | ₹680.8 crore |
| Expansion filed 25 Jul 2026 | Returned to applicant | 40.9 acres | ₹680.8 crore |
In context
167 applications in Khordha since January 2022 are in the same category (Buildings & townships): 103 approved, 31 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 40.9 acres, this one is larger than 92% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalibeti, Jankia, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Capacity Expansion of Existing Fruit Pulp/Juice -… — returned to applicant, 0 m away
- Proposed Environmental Clearance for the Construction of an Industrial… — lapsed, 550 m away
- Proposed Environmental Clearance for an Industrial Building With Total… — not approved, 750 m away
- Proposed Environmental Clearance for an Industrial Building With Total… — environmental approval granted, 750 m away
- Industrial Shed of EPIC Apparel Manufacturing Industry by M/s Trimetro… — environmental approval granted, 1.1 km away
- Proposed Greenfield Project of Integrated Paint and Coal Tar-Based Products… — more information requested, 1.9 km away
- Fresh EC of Mundamba Laterite Stone Quarry over an area of 2.00 Acres or 0.809… — environmental approval granted, 2.1 km away
- Olasingh Laterite Stone Quarry (C) over an area of 12.35 acres or 5.00… — more information requested, 2.6 km away
All 6 Varun Beverages projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.