Quick answers
What is this project?
Expansion of Iron Ore Production Capacity From 0.5716 Mtpa to 4.99 Mtpa at the Baitarani Iron Ore Mining Lease Over 65.397 Ha. in the Baitarani R.F., in Dist Keonjhar, Odisha is an approved mining project in Baitarani Rf, Joda, Kendujhar, Odisha. The site covers 161.6 acres.
Who is building it?
The applicant is Sunandan Pradhan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jul 2026), as of 27 Nov 2026.
Where is it?
In Baitarani Rf, Joda, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹28.4 crore and a site of 161.6 acres.
When was it filed?
The application was filed on 18 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jul 2026 |
| Application filed | 18 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Sunandan Pradhan |
| Land area | 161.6 acres (65.4 ha) |
| Project cost | ₹28.4 crore |
| Village / locality | Baitarani Rf |
| Taluk / tehsil | Joda |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02494 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 18 Dec 2025 (this page) | Environmental approval granted | 161.6 acres | ₹28.4 crore |
| Early planning filed 3 Jun 2025 | Cleared for impact study | 161.6 acres | ₹28.4 crore |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 161.6 acres, this one is larger than 60% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Baitarani Rf, Joda, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Iron Ore Production Capacity From 0.5716 Mtpa to 4.99 Mtpa at the… — cleared for impact study, 150 m away
- Amendment in Environmental Clearance granted to Joda East Iron Mine of Tata… — under environmental review, 1 km away
- Diversion Over 16.574 Ha of Forest Land As Per Sabik Records (As on… — more information requested, 1.1 km away
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review, 4 km away
- Enhancement in production capacity of Manganese Ore from 0.832 LTPA (0.978… — under environmental review, 4 km away
- Diversion Proposal for Seeking Prior Approval Under Section 2 of Van… — not approved, 4.4 km away
- Ratification of existing EC from EIA, 1994 to 2006 regime and Production… — under environmental review, 4.4 km away
- Laying of Water Pipeline from Village Kandra to Tanto for 2.4 MTPA Pallet… — lapsed, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.