Quick answers
What is this project?
Application for Extension of validity of Environmental Clearance for Production of 0.948 KLD Mahua Flower Based Out still Country Liquor Manufacturing unit of M/s Punada (Ghatagaon) Main Out Still Liquor Shop At- Punada, Ps/ Tahasil- Hinjilicut, District- Ganjam of the Licensee Sri Durgamadhab Sahu is an approved industrial project in Pitala, Seragad, Ganjam, Odisha. The site covers 0.2 acres.
Who is building it?
The applicant is Durgamadhab Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2025), as of 27 Nov 2026.
Where is it?
In Pitala, Seragad, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹15 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 2 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2025 |
| Application filed | 2 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Durgamadhab Sahu |
| Land area | 800 m² |
| Project cost | ₹15 lakh |
| Village / locality | Pitala |
| Taluk / tehsil | Seragad |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02572 |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 82% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pitala, Seragad, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-consideration for Validity extension of Environmental Clearance for… — not approved, 0 m away
- Extension of validity of Environmental Clearance for Production of Mahua… — not approved, 0 m away
- Pakidi Sand Bed over an area of 28.720 acres or 11.623 hectares bearing Khata… — environmental approval granted, 2.5 km away
- Pakidi Sand Bed over an area of 28.720 Acres or 11.623 Hectares bearing Khata… — lapsed, 2.5 km away
- Extension of Validity of Ec of Mining of Brick Earth From Kharida Brick Earth… — environmental approval granted, 6.5 km away
- Extension of validity of EC of Gudiali Stone Quarry over an area of 12.00… — lapsed, 6.7 km away
- Expansion of EC of Gudiali Stone Quarry over an area of 12.00 acres or 4.856… — environmental approval granted, 6.8 km away
- Extension of Validity of Ec of Mining of Brick Earth From Kharida Brick Earth… — environmental approval granted, 6.9 km away
More from Durgamadhab Sahu in Ganjam
- Re-consideration for Validity extension of Environmental Clearance for… — not approved
- Extension of validity of Environmental Clearance for Production of Mahua… — not approved
- Application for validity extension of EC for production of 1.896 KLD Mahua… — environmental approval granted
- Application for Validity extension of 2.532 KLD mahua flower based liquor… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.