Quick answers
What is this project?
Application for validity extension of EC for production of 1.896 KLD Mahua Flower Based Country Liquor Manufacturing Unit M/s Gangapur Main Out Still Liquor Shop, At- Mudulipalli, Tahasil- Bhanjanagar, Dist- Ganjam in favour of Sri Sanjaya Prasad is an approved industrial project in Mudulipalli, Bhanjanagar, Ganjam, Odisha. The site covers 0.4 acres.
Who is building it?
The applicant is Durgamadhab Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Mar 2025), as of 27 Nov 2026.
Where is it?
In Mudulipalli, Bhanjanagar, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹17 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 1 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Mar 2025 |
| Application filed | 1 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Durgamadhab Sahu |
| Land area | 1,500 m² |
| Project cost | ₹17 lakh |
| Village / locality | Mudulipalli |
| Taluk / tehsil | Bhanjanagar |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02662 |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 58% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mudulipalli, Bhanjanagar, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for validity extension of EC for production of 1.896 KLD Mahua… — not approved, 0 m away
- Application for Validity extension of 2.532 KLD mahua flower based liquor… — environmental approval granted, 0 m away
- Application for validity extension of EC for production of 1.896 KLD Mahua… — environmental approval granted, 0 m away
- Application for Validity extension of 2.532 KLD mahua flower based liquor… — environmental approval granted, 0 m away
- Validity extension of environmental Clearance (EC) for production of 1.58 KLD… — environmental approval granted, 1.3 km away
- Gamundi Jamapalli Sand Quarry over an area of 12.20 acres or 4.937 hectares… — environmental approval granted, 4.3 km away
- Gamundi Jamapalli Sand Quarry over an area of 12.20 acres or 4.937 hectares… — lapsed, 4.3 km away
- Extension of Validity of Ec of Nuagaon Sand Bed Over an Area of 12.355 Acres… — not approved, 4.8 km away
More from Durgamadhab Sahu in Ganjam
- Re-consideration for Validity extension of Environmental Clearance for… — not approved
- Extension of validity of Environmental Clearance for Production of Mahua… — not approved
- Application for Extension of validity of Environmental Clearance for… — environmental approval granted
- Application for Validity extension of 2.532 KLD mahua flower based liquor… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.