What is Developing? Open the mapMap

LapsedIndustry · Sundargarh, Odisha

Enhancement in production of existing sponge iron plant capacity from 60000 TPA to 270000 TPA, Production of 135000 TPA Steel Billets, 120000 TPA TMT Bars, Production of 26 MW power through WHRB (16 MW) and AFBC (10MW) Route and production of 30 million Flyash Bricks per annum by M/s Shree Hari Sponge Private Limited

Enhancement in production of existing sponge iron plant capacity from 60000 TPA to 270000 TPA, Production of 135000 TPA Steel Billets, 120000 TPA TMT Bars, Production of 26 MW power through WHRB (16 MW) and AFBC (10MW) Route and production of 30 million Flyash Bricks per annum by M/s Shree Hari Sponge Private Limited is a lapsed industrial project in Kendrikala, Banei, Sundargarh, Odisha. The site covers 10.3 acres. Its stated project cost is ₹334 crore. As of 27 Nov 2026, its status is “Lapsed” (since 12 Nov 2025).

See it on the live map All projects in Sundargarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleEnhancement in production of existing sponge iron plant capacity from 60000 TPA to 270000 TPA, Production of 135000 TPA Steel Billets, 120000 TPA TMT Bars, Production of 26 MW power through WHRB (16 MW) and AFBC (10MW) Route and production of 30 million Flyash Bricks per annum by M/s Shree Hari Sponge Private Limited located at Village- Kendrikala, Tahasil - Bonei, Dist: Sundergarh, Odisha
StatusLapsed
Status since12 Nov 2025
Application filed9 Oct 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantShree Hari Sponge PVT. LTD.
Land area10.3 acres (4.2 ha)
Project cost₹334 crore
Village / localityKendrikala
Taluk / tehsilBanei
DistrictSundargarh
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02760

In context

57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.3 acres, this one is smaller than 58% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kendrikala, Banei, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shree Hari Sponge PVT. LTD. in Sundargarh

All 3 Shree Hari Sponge projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.