Project details
| Official title | Ammendment in Existing EC for production of 270000 TPA Sponge Iron, 135000 TPA steel billet, 120000 TPA TMT Bar, Production of 26 MW Power through WHRB (16 MW) and AFBC (10 MW) route and production of 30 million of Fly Ash Brick per annlum by M/s Shree Hari Sponge Private Limited at Village Kendrikela, Tehsil- Bonai, Dist- Sundergarh, Odisha over an area of 55.0 Acres |
|---|---|
| Status | Lapsed |
| Status since | 2 Dec 2025 |
| Application filed | 31 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Shree Hari Sponge PVT. LTD. |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹334 crore |
| Village / locality | Forest |
| Taluk / tehsil | Banei |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02833 |
In context
57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.3 acres, this one is smaller than 58% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest, Banei, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement in production of existing sponge iron plant capacity from 60000… — lapsed, 0 m away
- Expansion of existing Sponge Iron unit of 60,000 TPA to an Integrated Steel… — more information requested, 0 m away
- Extension of validity of EC of Narendra Sand Bed-2 over an area of 19.80 acres… — environmental approval granted, 2.8 km away
- Narendra Sand Bed - 2 (Area - 8.012 ha.) — environmental approval granted, 2.8 km away
- Optimization and modification in EC configuration from 3x12 T IF to 2x20T IF;… — initial checks, 3.5 km away
- Reconsideration of the EC Application for Deogaon-II Sand Quarry over an Area… — not approved, 3.6 km away
- Grant of EC of DEOGAON-II SAND BED over an area 12.35Ac or 5.00Hc — not approved, 3.6 km away
- Modification Ec on the Basis of Replenishment Study Report of Kulange Basti… — environmental approval granted, 4.2 km away
More from Shree Hari Sponge PVT. LTD. in Sundargarh
- Enhancement in production of existing sponge iron plant capacity from 60000… — lapsed
- Expansion of existing Sponge Iron unit of 60,000 TPA to an Integrated Steel… — more information requested
All 3 Shree Hari Sponge projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.